Laserfiche WebLink
1.3 Monitoring and Reporting Procedures <br />This MMRP includes the following information: (1) mitigation measures that will either eliminate <br />or lessen the potential impact from the project; (2) the monitoring milestone or phase during <br />which the measure should be complied with or carried out; (3) the enforcement agency <br />responsible for monitoring mitigation measure compliance; and (4) the initials of the person <br />verifying the mitigation measure was completed and the date of verification. <br />The MMRP will be in place through all phases of a project including project design <br />(preconstruction), project approval, project construction, and operation (both prior to and post - <br />occupancy). The City will ensure that monitoring is documented through periodic reports and <br />that deficiencies are promptly corrected. The designated environmental monitor will track and <br />document compliance with mitigation measures, note any problems that may result, and take <br />appropriate action to rectify problems. <br />Each mitigation measure is listed and categorized by impact area, with an accompanying <br />discussion of: <br />• The phase of the project during which the measure should be monitored; <br />❑ Project review and prior to project approval <br />❑ During grading or building plan check review and prior to issuance of a grading or <br />building permit <br />❑ On -going during construction <br />❑ Throughout the life of the project <br />• The enforcement agency; and <br />• The initials of the person verifying completion of the mitigation measure and date. <br />The MMP is provided as Table 1 (Mitigation and Monitoring Reporting Program). <br />Sunflower Legacy Apartments — Mitigated Negative Declaration <br />Mitigation Monitoring and Reporting Plan <br />April 10, 2019 <br />Page 2 <br />751-198 <br />