My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 75D
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
CORRESPONDENCE - 75D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2019 12:19:02 PM
Creation date
6/4/2019 2:59:49 PM
Metadata
Fields
Template:
City Clerk
Item #
75D
Date
6/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S'�►B ® Technical Consultation, Data Analysis and <br />■!APE Litigation Support for the Environment <br />2656 29`h Street, Suite 201 <br />Santa Monica, CA 90405 <br />Matt Hagemann, P.G, C.Hg. <br />(949)887-9013 <br />mhaxemann@swaoe.com <br />May 28, 2019 <br />Richard Drury <br />Lozeau Drury LLP <br />1939 Harrison Street, Suite 150 <br />Oakland, CA 94612 <br />Subject: Comments on the MainPlace Mall Transformation Project <br />Dear Mr. Drury, <br />We have reviewed the May 2019 Addendum to the Fashion Square Commercial Center Final <br />Environmental Impact Report ("2019 Addendum"), the 1996 Addendum to the Environmental Impact <br />Report for Proposed MainPlace/Santa Ana Expansion ("1996 Addendum"), and the 1983 Final <br />Environmental Impact Report for the Fashion Square Commercial Center ("1983 EIR") for the MainPlace <br />Mall Transformation Project ("Project") located in the City of Santa Ana ("City"). The existing MainPlace <br />Mall consists of 1,130,000 square feet of commercial space and 4,882 parking spaces. The 2019 <br />Addendum proposes to retain the existing 1,130,000 square feet of commercial space and partially <br />demolish the existing parking areas in order to construct 270,000 square feet of additional commercial <br />space, 750,000 square feet of office space, a 400-room hotel, and 1,900 residential dwelling units on the <br />49.04-acre site. <br />Our review concludes that the 2019 Addendum fails to adequately evaluate the Project's Hazards and <br />Hazardous Waste, Air Quality, and Greenhouse Gas (GHG) impacts. As a result, emissions and health risk <br />impacts associated with construction and operation of the proposed Project are underestimated and <br />inadequately addressed. As neither the 2019 Addendum nor the 1983 EIR adequately evaluate the <br />Project's Air Quality and GHG impacts, and because the currently proposed 2019 Addendum Project <br />differs significantly from the project evaluated by the 1983 EIR, a full Environmental Impact Report (EIR) <br />should be prepared to adequately assess and mitigate the potential air quality and health risk impacts <br />that the currently proposed Project may have on the surrounding environment. <br />Hazards and Hazardous Waste <br />Failure to Evaluate Potential Impacts <br />Neither the 2019 Addendum nor the 1983 EIR adequately evaluate potential hazardous waste issues <br />because a Phase I Environmental Site Assessment (ESA) was not conducted for the Project Site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.