My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - Additional Staff Report submitted at Mtg by PBA Director
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - Additional Staff Report submitted at Mtg by PBA Director
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:20 AM
Creation date
6/7/2019 9:54:15 AM
Metadata
Fields
Template:
City Clerk
Item #
75D
Date
6/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1. Rights to Develop. Subject to the terms of this Agreement including the Reservation of <br />Rights in Section 3.3 below, Owner shall have a vested right to develop the Property in <br />accordance with, and to the extent of, this Agreement and the Project Approvals. <br />3.1.1. Except as expressly provided otherwise herein, the Project shall remain subject to <br />all Existing Land Use Regulations and Project Approvals. Except as otherwise provided in this <br />Agreement, and notwithstanding the authority of the City to further revise the Land Use <br />Regulations pursuant to Government Code section 65866, the permitted uses of the Property, the <br />density and intensity of use, the maximum height and size of proposed buildings, and provisions <br />for reservation and dedication of land for public purposes shall be those set forth in the Existing <br />Land Use Regulations and Project Approvals. <br />3.1.2. In accordance with Government Code Section 66452.6(a), any tentative map <br />approved which relates to all or a portion of the Property shall be extended for the greater of (i) <br />the Term of this Agreement or (ii) expiration of the tentative map pursuant to Section 66452.6. <br />3.1.3. Owner shall comply with all mitigation measures required to be undertaken <br />pursuant to any document prepared in compliance with the California Environmental Quality Act <br />with respect to the Project. <br />3.1.4. Notwithstanding Section 3.1.1 above, Owner acknowledges and agrees that the <br />Project requires additional Project Approvals (the Future Project Approvals identified in Section <br />1.1.14). These Future Project Approvals shall be consistent with the Existing Project Approvals <br />and this Agreement as to the permitted uses of the Property, the density and intensity of use, the <br />maximum height and size of proposed buildings, and provisions for reservation and dedication of <br />land for public purposes; however the Future Project Approvals may include additional <br />conditions that are lawful and appropriate to the type of Project Approval. <br />3.2. Effect of Agreement on Land Use Regulations. Except as otherwise provided under the <br />terms of this Agreement including the Reservation of Rights in Section 3.3 below, the rules, <br />regulations and official policies governing permitted uses of the Property, the density and <br />intensity of use of the Property, the maximum height and size of proposed buildings, and the <br />design, improvement and construction standards and specifications applicable to development of <br />the Property shall be the Existing Land Use Regulations and Project Approvals. In connection <br />with any subsequently adopted Project Approvals and except as specifically provided otherwise <br />herein, City may exercise its discretion in accordance with the Land Use Regulations then in <br />effect, as provided by this Agreement, including, but not limited to, the Reservation of Rights. <br />City shall accept for processing, review, and take action on all applications for subsequent Project <br />Approvals, and such applications shall be processed in the same manner and the City shall <br />exercise its discretion, when required or authorized to do so, to the same extent it would <br />otherwise be entitled in the absence of this Agreement. <br />3.2.1. City shall reasonably strive to complete: <br />(a) its initial review of individual development projects within 30 days after <br />the application is deemed complete, <br />(b) any second plan review within 15 days after submission, and <br />(c) any third plan review within 10 days after submission. <br />-11- <br />55394.00053\31891805.16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.