My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-06-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/18/2019
>
FULL PACKET_2019-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 9:50:45 AM
Creation date
6/17/2019 8:35:46 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/18/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
704
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Penaloza, directed staff to include completion timeline for all <br />future projects in staff reports. <br />Executive Director of Public Works Agency Fuad Sweiss spoke. <br />MOTION: <br />Award a contract to EBS General Engineering, Inc., the lowest <br />responsible bidder, in accordance with the base bid in the amount of <br />$874,300, for construction of the Residential Street Repair Program and <br />Alley Improvement Project, for the term beginning upon execution of <br />the contract and ending upon project completion, and authorize the City <br />Manager and the Clerk of the Council to execute the contract subject to <br />non -substantive changes approved by the City Manager and the City <br />Attorney. <br />2. Approve the Project Cost Analysis for a total estimated construction <br />delivery cost of $1,092,874, which includes the $874,300 contract, <br />$87,430 as a 10% project contingency, $59,000 for Contract <br />Administration, and $72,144 for Inspection and Testing. The project will <br />be paid by Community Development Block Grant and Measure M2 Local <br />Fairshare funds. The budget is sufficient to cover the contract. <br />MOTION: Penaloza <br />SECOND: Sarmiento <br />VOTE: AYES: <br />Iglesias, Penaloza, , Sarmiento, Solorio, Villegas (5) <br />NOES: <br />None (0) <br />ABSTAIN: <br />None (0) <br />ABSENT: Pulido(1) <br />* Ward 4 representative vacant. <br />*MOTION TO RECONSIDER ITEM 22A TAKEN AFTER DELIBERATION OF ITEM 23A. <br />MOTION: Amend the Fiscal Year 2017-18 and 2018-19 Capital Improvement <br />Programs by removing $200,000 in unspent Measure M2 Fairshare funding <br />from the Traffic Signal Equipment Replacement (Project No. 18-6914) and <br />reallocating the funds to Traffic Signal Operations (Project No. 19-6720). <br />Council discussion ensued: <br />MAY 21, 2019 <br />CITY COUNCIL MINUTES 16 <br />10A-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.