Laserfiche WebLink
DATE OBSERVED: 6-19-85 METHOD OF DRILLING:_ 13'' Bucket Auger <br />2200 to 231; 1450 to 46'; 700 <br />LOGGED BY: MBC GROUND ELEVATION: 1471 LOCATION: See Plot Plan <br />O <br />W <br />W <br />F- <br />< <br />O <br />0 <br />W <br />mW <br />J <br />a <br />W <br />0}CV <br />no. <br />BORING NO. 20 <br />V <br />U. <br />�a <br />a <br />�z <br />W} <br />(CONTINUED) <br />x <br />y <br />3 <br />yQ <br />N <br />COW <br /><F <br />SOIL TEST <br />a <br />coO <br />oy <br />-J <br />O <br />�Z O <br />aZ <br />DESCRIPTION <br />a <br />U <br />m: <br />m <br />O <br />ZW <br />40 <br />3 <br />46 <br />@47' Locally wet <br />@48' Becomes reddish brown sandy SILT, <br />32 <br />slightly clayey, very moist <br />50 <br />4 ' Moist very stiff <br />TOTAL DEPTH 50' <br />No Groundwater <br />No Caving <br />55 <br />80 <br />86 <br />70 <br />76 <br />80 <br />JOB No.: 2702_00 <br />LOG OF BORING <br />FIGURE: B_38 <br />IRVINE SOILS ENGINEERING. INC. <br />