Laserfiche WebLink
DATE OBSERVED: 6-20-85 METHOD OF DRILLING: 18" Bucket Auger <br />_ 2200 to 23'; 1450 to 461; 700 <br />LOGGED BY: MBC GROUND ELEVATION: 148+ LOCATION: See Plot Plan <br />w <br />z <br />O <br />Q <br />O <br />0 <br />w <br />mw <br />a <br />a <br />ae <br />c" <br />cc0 <br />oa <br />BORING NO. 21 <br />;; <br />O <br />" <br />Ma <br />a <br />rn <br />t�-z <br />w} <br />(CONTINUED) <br />m <br />3 <br />ya <br />N W <br /><t <br />SOIL TEST <br />a <br />W <br />O <br />00 <br />= <br />J <br />Oz <br />2O <br />-'W <br />ILZ <br />DESCRIPTION <br />O <br />U <br />m <br />M <br />M <br />V <br />TQ <br />40 <br />@41' Becomes very moist <br />45 <br />Becomes very bouldery - difficult <br />drilling <br />TOTAL DEPTH 43' <br />60 <br />No Groundwater <br />Caving between 14.5 and 18' <br />56 <br />80 <br />86 <br />70 <br />76 <br />80 <br />JOB NO.: 2702-00 <br />LOG OF BORING <br />FIGURE: B-38 <br />IRVINE SOILS ENGINEERING,INC. <br />