Laserfiche WebLink
DATE OBSERVED:. 6-21-85 METHOD OF DRILLING: 18" Bucket Auger <br />2200 to 23" 1450 to 461: 7oo <br />LOGGED BY: MBC GROUND ELEVATION: 1491 LOCATION: See Plot Plan <br />1- <br />w <br />0 <br />a <br />I- <br />0 <br />mw <br />W <br />a <br />.. <br />c <br />Y LL <br />ca <br />-BORING NO. 25 <br />;6 <br />V <br />, <br />�Ja <br />a <br />FZ <br />WY <br />(CONTINUED) <br />a <br />w <br />3 <br />Lo <br />y <br />NF <br /><� <br />SOIL TEST <br />c< <br />m <br />zN <br />X <br />m <br />0 2 <br />20 <br />-� fA <br />zW <br />DESCRIPTION <br />0 <br />40 <br />SC <br />GW <br />45 <br />ML <br />Dark brown SILT, very moist, slightly <br />clayey, slight sand, firm <br />SW <br />Becomes SAND with gravel, very moist <br />50 <br />CL <br />@49.5' Becomes reddish brown silty <br />CLAY, moist <br />TOTAL DEPTH 51' <br />No Groundwater <br />No Caving <br />55 <br />60 <br />65 <br />70 <br />75 <br />80 <br />JOB No.: 2702-00 <br />LOG OF BORING <br />FIGURE: B_48 <br />IRVINE SOILS ENGINEERING. INC. <br />