Laserfiche WebLink
Water Quality Management Plan (WQMP) <br />Mainplace Mall Specific Plan <br />IV.3.3 Evapotranspiration, Rainwater Harvesting BMPs <br />If the full Design Storm Capture Volume cannot be met with infiltration BMPs, describe any <br />evapotranspiration and/or rainwater harvesting BMPs included. <br />Name <br />Included? <br />All FISCs; See Section IV.3.1 <br />Surface -based infiltration BMPs <br />❑ <br />Biotreatment BMPs <br />❑ <br />Above -ground cisterns and basins <br />❑ <br />Underground detention <br />❑ <br />Other: <br />❑ <br />Other: <br />❑ <br />Other: <br />❑ <br />It is anticipated that the entire LID Design Strom Capture volume will be treated through <br />infiltration. For sites where infiltration is infeasible based on site-spedfic infiltration testing, <br />biofiltration would be used. <br />Centennial Section IV <br />Conceptual Specific Plan WQMP Page 25 <br />