My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MainPlace Mall Transformation Project 12126.001 <br />TABLE OF CONTENTS <br />Section Paqe <br />1 INTRODUCTION.................................................................................................. 1 <br />1.1 <br />Site Description and Proposed Development.......................................................1 <br />1.2 <br />Objective and Scope of Work...............................................................................2 <br />2 FIELD <br />AND LABORATORY EXPLORATION.....................................................4 <br />2.1 <br />Subsurface Soil Conditions..................................................................................4 <br />2.2 <br />Groundwater Conditions......................................................................................5 <br />2.3 <br />Field Infiltration Test.............................................................................................5 <br />2.4 <br />Geotechnical Laboratory Testing.........................................................................6 <br />3 SEISMIC HAZARD ASSESSMENTS................................................................... <br />7 <br />3.1 <br />Surface Fault-Rupture..........................................................................................7 <br />3.2 <br />Seismicity and Ground Shaking...........................................................................7 <br />3.3 <br />Liquefaction Potential...........................................................................................8 <br />3.4 <br />Seismically -Induced Settlement...........................................................................9 <br />3.5 <br />Seismically -Induced Lateral Spread.....................................................................9 <br />3.6 <br />Flood hazards......................................................................................................9 <br />3.7 <br />Other hazards....................................................................................................10 <br />4 CONCLUSIONS <br />AND DESIGN CONSIDERATIONS ........................................ <br />11 <br />4.1 <br />Conclusion.........................................................................................................11 <br />4.2 <br />Design Considerations.......................................................................................11 <br />4.2.1 Site Grading...........................................................................................11 <br />4.2.2 Trench Backfill........................................................................................13 <br />4.2.3 Foundation Design Recommendations...................................................13 <br />4.2.4 Earth Retaining Structures.....................................................................15 <br />4.2.5 Surface Drainage...................................................................................16 <br />4.2.6 Corrosion Protection Measures..............................................................16 <br />4.2.7 Pavements.............................................................................................17 <br />4.2.8 Stormwater Management.......................................................................19 <br />5 LIMITATIONS.....................................................................................................20 <br />ATTACHMENTS <br />Figure 1 — Site Location Map <br />Figure 2 — Exploration Location Map <br />Figure 3 — Regional Geology Map <br />Figure 4 — Regional Fault and Historic Seismicity Map <br />Figure 5 — Seismic Hazard Map <br />Figure 6 — Flood Hazard Zone Map <br />!oto <br />jo <br />Leighton <br />
The URL can be used to link to this page
Your browser does not support the video tag.