My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MainPlace Mall Transformation Project 12126.001 <br />The mat foundation was assumed to be 450 feet long and 125 wide <br />supported on engineered fill derived from on -site granular soils. The <br />recommended design parameters for mat foundation presented above <br />was based on a total settlement of approximately 2 inches at the center of <br />the mat and 1 inch at the edge of the mat under a uniform pressure of <br />1,500 psf. The potential impact of seismically -induced settlement should <br />also be considered in evaluation of foundation system alternatives (See <br />Section 3.4). The subgrade modulus can be refined when the foundation <br />plan and structural loading information become available. <br />Pile Foundation (40 feet below pile cap) <br />24-inch Drilled Piles 1 225 kips <br />14-inch Driven Concrete Piles 1175 kips <br />Pile settlement is not expected to exceed 1 inch total and Y2 inch differential <br />over a distance of 40 feet. The potential impact of seismically -induced <br />settlement should also be considered in evaluation of foundation system <br />alternatives (See Section 3.4). No capacity reduction is required if the piles <br />are spaced at least 2.5 times on center. <br />4.2.4 Earth Retaining Structures <br />The following parameters may be used to calculate lateral pressure for <br />earth retaining structures supporting non -expansive backfill: <br />Condition.. <br />- <br />Active (Ka) 0.31 <br />0.46 <br />At -Rest (Ko) <br />0.47 <br />0.68 <br />Seismic Increment <br />0.22 <br />0.37 <br />(unrestrained) <br />Seismic Increment <br />0.36 <br />0.52 <br />(Restrained) <br />Level Passive (Kp) <br />3.26 <br />Coefficient of Friction <br />0.35 <br />15 <br />Leighton <br />
The URL can be used to link to this page
Your browser does not support the video tag.