Laserfiche WebLink
D Y O D S TM <br />Design Your Own Detention System <br />A��I��VTCAV® <br />CONSTRUCTION PRODUCTS INC. <br />\\I// „vie^RA® <br />�� kWil `= r� <br />CMP DETENTION SYSTEMS <br />For design assistance, drawings, <br />and pricing send completed worksheet to: <br />dyods@contech-cpi.com,>� <br />Access <br />Riser <br />Barrels <br />Header <br />- - <br />Bands_ <br />Project Summary <br />Date: <br />4/24/2019 <br />Project Name: <br />City / County: <br />Mainplace Parcel 6 <br />Finished <br />Pavement Ereva oGrade <br />Santa Ana <br />California <br />State: <br />Designed By: <br />Company: <br />Telephone: <br />Enter Information in <br />Blue Cells <br />Jason Marechal <br />Q <br />_ <br />Backfill to Grade N ' <br />-- <br />- . - - -- _ _ _ _ - - - - - - - --- - - - - ` <br />a <br />0 <br />Kimley-Horn <br />(714) 786-6183 <br />Corrugated Metal Pipe <br />Calculator <br />Storage Volume Required (cf): <br />Limiting Width (ft): <br />27,500 <br />100.00 <br />10.00 <br />Effective Depth Below Asphalt (ft): <br />Solid or Perforated Pipe: <br />Shape Or Diameter: <br />12.57 ftZ Pipe Area <br />- <br />spacloy - - sp `"l"' - z <br />W <br />Solid <br />48 <br />Spacing between Barrels (ft): <br />2.00 <br />Stone Width Around Perimeter of System (ft): <br />0 <br />Depth A: Porous Stone Above Pipe (in): <br />12 <br />Depth C: Porous Stone Below Pipe (in): <br />Stone Porosity (0 to 40%): <br />10 <br />40 <br />System Sizing Use Custom Layout (at right) for layout adjustment <br />Custom Layout <br />To adjust layout, enter desired barrel length in the light blue boxes below. <br />Pipe Storage: 27,558 cf <br />Porous Stone Storage: <br />0 cf <br />Additional Footage <br />Required = 2193 <br />Total Storage Provided: <br />27,558 cf 100.2% Of Required Storage <br />Number of Barrels: 17 barrels <br />Length Per Barrel: 129.00 ft <br />Rectangular Footprint (W x L): 100. ft x 129. ft <br />Barrel 12 0 <br />Barrel 11 0 <br />Barrel 10 o <br />Number Of Barrels Exceed Graph <br />Limitations <br />Barrel <br />Barrel 8 <br />Barrel 7 <br />0 <br />0 <br />0 <br />CONTECH Materials <br />Total CMP Footage: 2,193 ft <br />Approximate Total Pieces: <br />102 pcs <br />Barrel 6 <br />0 <br />Approximate Coupling Bands: <br />85 bands <br />Barrel 5 <br />0 <br />Approximate Truckloads: <br />13 trucks <br />Barrel 4 <br />Barrel <br />Barrel 2 <br />0 <br />0 <br />0 <br />ConstructionQuantities" <br />Total Excavation: 4778 cy <br />Porous Stone Backfill For Storage: <br />0 cy Stone <br />Barrel 1 <br />0 <br />Backfill to Grade Excluding Stone: <br />3757 cy Fill <br />—Construction quantities are approximate and should be verified upon final design <br />© 2007 CONTECH Stormwater Solutions <br />