Laserfiche WebLink
MPA2.OUT <br />INITIAL SUBAREA FLOW-LENGTH(FEET) = 150.00 <br />ELEVATION DATA: UPSTREAM(FEET) = 156.00 DOWNSTREAM(FEET) = 153.20 <br />Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 <br />SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.001 <br />* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 2.263 <br />SUBAREA Tc AND LOSS RATE DATA(AMC II): <br />DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap <br />SCS Tc <br />LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) <br />CN (MIN.) <br />COMMERCIAL B 1.67 0.30 0.100 <br />56 5.00 <br />SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.30 <br />SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100 <br />SUBAREA AREA(ACRES) = 1.67 INITIAL SUBAREA RUNOFF(CFS) = <br />3.36 <br />** ADD SUBAREA RUNOFF TO MAINLINE AT MAINLINE Tc: <br />MAINLINE Tc(MIN.) = 6.87 <br />* 2 YEAR RAINFALL INTENSITY(INCH/HR) = 1.886 <br />SUBAREA AREA(ACRES) = 1.67 SUBAREA RUNOFF(CFS) = 2.79 <br />EFFECTIVE AREA(ACRES) = 4.87 AREA -AVERAGED Fm(INCH/HR) <br />= 0.03 <br />AREA -AVERAGED Fp(INCH/HR) = 0.30 AREA -AVERAGED Ap = 0.10 <br />TOTAL AREA(ACRES) = 4.9 PEAK FLOW RATE(CFS) = <br />8.14 <br />FLOW PROCESS FROM NODE 140.00 TO NODE 150.00 IS CODE = 41 <br />>>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< <br />>>>>>USING USER -SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<< <br />---------------------------------------------------------------------------- <br />----------------------------------------- <br />ELEVATION DATA: UPSTREAM(FEET) = 143.60 DOWNSTREAM(FEET) = 141.80 <br />FLOW LENGTH(FEET) = 271.00 MANNING'S N = 0.013 <br />DEPTH OF FLOW IN 24.0 INCH PIPE IS 11.3 INCHES <br />PIPE -FLOW VELOCITY(FEET/SEC.) = 5.58 <br />GIVEN PIPE DIAMETER(INCH) = 24.00 NUMBER OF PIPES = 1 <br />PIPE-FLOW(CFS) = 8.14 <br />PIPE TRAVEL TIME(MIN.) = 0.81 Tc(MIN.) = 7.68 <br />LONGEST FLOWPATH FROM NODE 120.00 TO NODE 150.00 = 904.00 FEET. <br />+ + <br />DA-A6 <br />+ + <br />**************************************************************************** <br />FLOW PROCESS FROM NODE 150.00 TO NODE 150.00 IS CODE = 82 <br />---------------------------------------------------------------------------- <br />>>>>>ADD SUBAREA RUNOFF TO MAINLINE, AT MAINLINE Tc,<<<<< <br />>>>>>(AND COMPUTE INITIAL SUBAREA RUNOFF)<<<<< <br />---------------------------------------------------------------------------- <br />Page 10 <br />