My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRESENTATION - 75A (2)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
PRESENTATION - 75A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 4:35:11 PM
Creation date
6/21/2019 2:53:04 PM
Metadata
Fields
Template:
City Clerk
Item #
75A
Date
6/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2019-XXX <br />3.92% <br />PROPOSED <br />REVENUE <br />FY 18-19 <br />FY 19-20 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />51601 <br />SPECIAL INVESTIGATION FEE <br />96.78 <br />100.57 <br />51602 <br />51603 <br />A special investigation fee shall be charged by the Building <br />51611 <br />Official for any Investigation of a building structural work, <br />51604 <br />reports, certification, or any other related work requested by <br />51606 <br />an owner or his authorized agent. Said fee shall be assessed <br />in an amount sufficient to reimburse the City for the costs <br />actually incurred by the City based upon a rate of $96.78 per hour <br />but in no case shall be less than $96.78. <br />51601 <br />VIOLATION/INVESTIGATION FEES <br />96.78 <br />100.57 <br />51602 <br />51603 <br />When any work for which a permit is required has been <br />51611 <br />commenced without the authorization of such permit, an <br />51604 <br />investigation may be required before a permit will be Issued <br />51606 <br />for such work. An investigation fee shall be assessed In an <br />amount sufficient to reimburse the City for costs actually <br />incurred by the City based on a rate of 96.78-per hour but <br />In no case less than $96.78 shall be collected. <br />51601 <br />PENALTY FEES <br />243.16 <br />252.69 <br />51602 <br />51603 <br />In addition to the investigation fee and regular permit fee, a <br />51611 <br />penalty in an amount equal to the amount of the total permit <br />51604 <br />fee shall be required, but in no case less than $243.16. <br />51606 <br />51601 <br />EXPEDITED COPY REQUEST Per Hour <br />66.11 <br />68.70 <br />51601 <br />DEMOLITION PERMIT <br />96.78 <br />100.57 <br />The fee for a permit to demolish a building or structure shall <br />be based upon the contract price but In no case less than the <br />minimum building permitfee of $96.78. <br />098001001- <br />When a building is demolished, the owner shall provide the <br />24015 <br />City with a cash orsurety bond as described in Section 8-1768 <br />through 8-1771 of the Santa Ana Municipal Code. Forthe <br />purpose of lot cleanup and capping of the sewer lateral, the <br />value of the bond is to be established bythe Building Official <br />but in no case shall the bond be less than $1,000 per <br />building. A single family dwelling and garage shall be <br />considered as one building for bonding purposes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.