Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 1�Z683--THRU,18=2689: NEW LIGHTING AT <br />SIX PARKS ' <br />Construction Contract <br />$ <br />- `579,378.00 <br />Contract Administration, Inspection and Testing <br />$ <br />-86,906.00_ <br />Contingencies <br />$ <br />57,716.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />724;000.00- <br />1Wl:ll iffil <br />20A-27 <br />