Laserfiche WebLink
City of Santa Ana <br />Page 2 <br />New Lighting at 8 Parks (18-2683 thru 18-2689), bidding on May 22, 2019 2:00 PM (Paciflc) <br />Printed 05/22/2019 <br />Bid Results <br />Type <br />Item Code UCM aty <br />Unit Price <br />Line Total Comment <br />3 <br />NEW LIGHTING AT CHAVEZ PARK <br />LS 1 <br />$72,945.62 <br />$72.945.62 <br />4 <br />NEW LIGHTING AT PORTOLA PARK <br />LS 1 <br />$133,803.92 <br />$133,803.92 <br />5 <br />NEW LIGHTING AT RIVERVIEW PARK <br />LS 1 <br />$110,886.75 <br />$110,886.75 <br />6 <br />NEW LIGHTING AT ROSITA PARK <br />LS 1 <br />$104,274.27 <br />$104,274.27 <br />7 <br />ADDITIONAL LIGHT POLE" <br />FA 5 <br />$3.316.02 <br />$18,660.10 <br />8 <br />ADDITIONAL LIGHT POLE ASSEMBLY' <br />EA 5 <br />$2,222.58 <br />$11,112.80 <br />9 <br />ADDITIONAL WIRING* <br />LF 300 <br />$16.10 <br />$4,830.00 <br />10 <br />ADDITIONAL CONDUIT* <br />LF 300 <br />$15.75 <br />$4,725.00 <br />11 <br />AS -BUILT DRAWINGS <br />LS 1 <br />$3,687.50 <br />$3,587.50 <br />12 <br />LABOR AGREEMENT OVERSIGHT <br />Ls 1 <br />$10.000.00 <br />$10,666.00 <br />Subtotal <br />$579,378.17 <br />Asterisk Notes (Per Section 3.2 of Standard Specifications) -NOT part of Total <br />Bid Calculation <br />13 <br />' = The quantity for this bid Item Is shown forbid comparison only. This bid Item shall <br />not be subject to the "25%" limit as stated In Section 3-2 of <br />the Standard Specifications. The actual amount for this Item will be dictated by the actual quantitiy used, and the Agency reserves the right to <br />Increase or decrease the quanflty of this Item accordingly. <br />EA 0 <br />$16.10 <br />0 <br />14 <br />t = This bid Rem is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />EA 0 <br />$15.75 <br />0 <br />Subtotal <br />0 <br />Total <br />$579,378.17 <br />PlanotBids, Inc. <br />20A-8 <br />