2 Perform the work daily.
<br />a Provide the necessary labor, materials and equipment to remove weeds from all
<br />sidewalk areas, planters and public lots.
<br />4. Remove all litter (trash, paper, cans, bottles, signs and otherdeblfs).
<br />5. Remove all unwanted natural or environmental materials, including, but not limited
<br />to bio-waste, hypodermic needles, dirt, silt, feces, soot, weeds.
<br />6. Clean, cut, clear, and remove weeds and remove of light to medium amounts of
<br />trash by using hand-held equipment like weed eaters, rakes, brooms, and leaf
<br />blowers. Leave no plies, or residue with rake marks. Sidewalk surface shall be
<br />clean of leaves, litter, and dirt.
<br />T Crew must be self -directed and report directly to the main office of Contractor.
<br />a Crew must be "on -call" and carry a dedicated cell phone and be available during
<br />normal business hours on all workdays.
<br />9. Additional duties that may be required of the Right of Way Cew may include the
<br />following: clear catch basins during winter rain and storms, fill sandbags, remove
<br />extra trash and debris generated by special events, remove litter and vegetation at
<br />City -owned parcels, remove homeless camp debris, and assist street sweepers in
<br />debris removal during weather events, ex. wind or rain.
<br />10. Note the trash likely to be encountered during the course of Right of WavCleaning
<br />includes but is not limited to litter, trash, bio-waste and hypodermic needles, plastic,
<br />and cardboard containers, plywood, used lumber, discarded furniture, and small
<br />appliances, toys and other household items.
<br />11. Remove and dispose of items listed above according to all applicable laws, codes,
<br />and requirements.
<br />12 Note that trash removal is incidental to weed removal by either crew. It is included
<br />so that the areas look clean after the weed removal work is completed.
<br />18 The Contractor shall collect all clippings, trimmings, cuttings, rubbish and debris, and
<br />posted signs at all work sites and dispose of same in a lawful manner per contract
<br />requirements at the Contractor's expense.
<br />14. All trash and debris shall be removed from all worksites a minimum of one (1) time per
<br />week.
<br />15. The Contractor shall rake, hand remove, or vacuum leaves that are not absorbed by
<br />planting. This shall be done as often as required to maintain a neat appearance, or prevent
<br />plants from being smothered by seasonal leaf drop at least weekly or as directed by
<br />Projects Manager or designee.
<br />25F-20
<br />
|