My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO WATER SUPPLY ASSESSMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
55A - RESO WATER SUPPLY ASSESSMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:19:54 PM
Creation date
6/27/2019 5:06:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
7/2/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 URBAN WATER MANAGEMENT PLAN <br />Table 2-1: Population — Current and Projected..........................................................................................2-2 <br />Table 2-2: Demands for Potable and Raw Water - Actual (AF).................................................................2-3 <br />Table 2-3: Water Loss Audit Summary (AF)..............................................................................................2-6 <br />Table 24: Demands for Potable and Raw Water - Projected(AF)............................................................2-7 <br />Table 2-5: Inclusion in Water Use Projections...........................................................................................2-8 <br />Table 2-6: Total Water Demands(AF).......................................................................................................2-8 <br />Table 2-7: Household Distribution Based on Median Household Income..................................................2-9 <br />Table 2-8: Projected Water Demands for Housing Needed for Low Income Households (AF)...............2-10 <br />Table 2-9: Baselines and Targets Summary ............................................................................................2-13 <br />Table2-10: 2015 Compliance..................................................................................................................2-13 <br />Table 3-1: Metropolitan Colorado River Aqueduct Program Capabilities..................................................3-6 <br />Table 3-2: Groundwater Volume Pumped(AF)........................................................................................3-13 <br />Table 3-3: Water Supplies, Actual(AF)....................................................................................................3-14 <br />Table 34: Water Supplies, Projected(AF)...............................................................................................3-15 <br />Table 3-5: Basis of Water Year Data........................................................................................................3-21 <br />Table 3-6: Normal Year Supply and Demand Comparison(AF)..............................................................3-21 <br />Table 3-7: Single Dry Year Supply and Demand Comparison(AF).........................................................3-22 <br />Table 3-8: Multiple Dry Years Supply and Demand Comparison (AF)....................................................3-22 <br />Table4-1: Water Waste Prohibition...........................................................................................................4-2 <br />Table 4-2: Water Rates Effective July 1, 2015...........................................................................................4-3 <br />Table 5-1: Stages of Water Shortage Contingency Plan ............................................. <br />Table 5-2: Minimum Supply Next Three Years (AF).................................................... <br />Table 5-3: Restrictions and Prohibitions on End Uses ................................................. <br />..........5-5 <br />.............................5-7 <br />Table 5-4: Stages of Water Shortage Contingency Plan - Consumption Reduction Methods.................5-12 <br />Table 5-5: Revenue Impact Analysis ...................... .................................................................................. 5-12 <br />Table 6-1: Wastewater Collected Within Service Area in 2015(AF)..........................................................6-3 <br />Table 6-2: 2010 UWMP Recycled Water Use Projection Compared to 2015 Actual(AF).........................6-5 <br />Table 6-3: 2010 UWMP Recycled Water Use Projection Compared to 2015 Actual(AF).........................6-6 <br />Table 8-1: External Coordination and Outreach.........................................................................................8-1 <br />Table 8.2: Notification to Cities and Counties ....... <br />.............8-2 <br />arcadis.com MY v <br />
The URL can be used to link to this page
Your browser does not support the video tag.