My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60A - CHANNEL REPAIR PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
60A - CHANNEL REPAIR PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:20:57 PM
Creation date
6/27/2019 5:07:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
60A
Date
7/2/2019
Destruction Year
2024
Document Relationships
BOSCO CONSTRUCTORS, INC.
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Federal Emergency Manageme( \gency E-Grants <br />Page 10 of 16 <br />SANTA ANA : PA-09-CA-4305-PW-00580 <br />Conditions Information <br />conditions of the required <br />permit. All coordination <br />pertaining to these activities <br />shall be documented and <br />copies forwarded to the <br />California Office of <br />Emergency Services and <br />the FEMA Public <br />Assistance Program as part <br />of the permanent project <br />files. <br />If ground disturbing <br />activities occur during <br />construction, applicant will <br />monitor ground disturbance <br />Final Review <br />Other (EHP) <br />Standard <br />Condition #3 <br />and if any potential <br />archeological resources are <br />No <br />Approved <br />discovered, will immediately <br />cease construction in that <br />area and notify the State <br />and FEMA. <br />This review does not <br />address all federal, state <br />and local requirements. <br />Acceptance of federal <br />funding requires recipient to <br />Final Review <br />Other (EHP) <br />Standard <br />comply with all federal, <br />No <br />Approved' <br />Condition #2 <br />state and local laws. Failure <br />to obtain all appropriate <br />federal, state and local <br />environmental permits and <br />clearances may jeopardize <br />federal funding. <br />Any change to the <br />approved scope of work will <br />Final Review <br />Other (EHP) <br />Standard <br />require re-evaluation for <br />No <br />Approved <br />Condition #1 <br />compliance with NEPA and <br />other Laws and Executive <br />Orders. <br />Final Review <br />Other (EHP) <br />Resource <br />In the event that petroleum <br />Yes <br />Approved <br />Conservation and <br />products, hazardous <br />Recovery Act, aka <br />materials or toxic waste; or <br />Solid Waste <br />equipment, debris or <br />Disposal Act <br />materials contaminated with <br />(RCRA) <br />these products have been <br />discovered during <br />implementation of the <br />Undertaking, <br />Documentation will be <br />provided to the State and <br />FEMA, showing that all <br />materials and Items shall be <br />handled, managed, <br />transported and disposed in <br />https://isource.fema.gov/enimie/viewApplicati6Og4VQZvigatable&pageName=&vo.i •.. 7/26/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.