My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60A - CHANNEL REPAIR PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
60A - CHANNEL REPAIR PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:20:57 PM
Creation date
6/27/2019 5:07:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
60A
Date
7/2/2019
Destruction Year
2024
Document Relationships
BOSCO CONSTRUCTORS, INC.
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
", Vederal Emergency Manageme> gency E-Grants <br />Page 15 of 16 <br />Internal Comments <br />No. <br />Queue <br />User <br />Date(rlme <br />Reviewer Comments <br />including <br />funding. <br />- tnewson - 0710512018 22:31:27 GMT <br />The project is located In Orange County that is within a <br />nonattainment area for PM-2.5 (1997. 2006, 2012) and 8-Hr <br />Ozone (2008) according to the U.S. Environmental_ Protection <br />Agency (USEPA): <br />https://www3.epa.gov/airquality/greenbook/anayo—ca.htmi <br />updated June 30, 2018, Based on the scope of work, the <br />potential emissions from project activities are clearly below de <br />minimis thresholds for the General Conformity Rule. Thus, the <br />project is exempt from a conformity. determination. See <br />condition. -tnewson - 07/05/2018 22:37:00 GMT <br />The scope of work associated with this Undertaking has the <br />potential to affect waters of the USA. In accordance with a <br />Memorandum of Understanding signed Feb 11th, 2015, FEMA <br />and the U.S. Army Corps of Engineers (USACE) established <br />that-FEMA will be the Lead Federal Agency for Clean Water <br />Act (CWA) compliance, as described in the attached <br />documentation. See attachment and Condition. - tnewson - <br />07/05/2018 22:33:19 GMT <br />Per the U.S. Fish and Wildlife Service Wetland Mapper viewed. <br />on 7/5/18, this project Is located within a designated wetland. <br />The proposed action is not likely to result in any potential direct <br />Impacts that will adversely affect the natural values and <br />function of wetlands. Initial Disaster Public Notice was <br />published on March 16, 2017. See Conditions. - tnewson - <br />07/06/2018 22:39:03 GMT <br />The proposed project will not destroy or adversely modify <br />suitable habitat and will not affect any other listed or proposed <br />species under the jurisdiction of the USFWS. It is therefore <br />determined the proposed project would have 6No Effect!, on <br />listed species and consultation with the USFWS under Section <br />7 of the Endangered Species Act is not required. See attached <br />species list and No Effect Determination. - tnewson - <br />07/05/2018 22:32:01 GMT <br />See Condition. - tnewson - 07/05/2018 22:41:58 GMT <br />Per Flood Insurance Rate Map (FIRM) panel 06059CO256J, <br />dated 12/312009, the project is located outside the Special <br />Flood Hazard Area (100-year floodplain, base floodplain) and <br />the activity does not adversely affect floodplain values. - <br />mthorsgl- 02111/201D 02:57:21 GMT <br />The Undertaking was reviewed by Cindy Thomack, who meets <br />the applicable Secretary of the Interior Professional <br />Qualifications in accordance with Stipulation I.B.1.a. of the <br />Programmatic Agreement among the Federal Emergency <br />Management Agency (FEMA), State Historic Preservation <br />Office (SHPO) and California Office of Emergency Services <br />(Cal OES) signed October 30, 2014. The Undertaking complies <br />with Second Tier Programmatic Allowance II.E.1.(a) (In -kind <br />repairs or replacement to canal systems) (Appendix B) of the <br />Agreement Thus, the Undertaking does not require SHPO <br />review or notification per Stipulation.11.A.1. of the Agreement. - <br />asaunde7 - 02/15/2018 17:35:16 GMT <br />4 <br />Insurance <br />SMITH <br />01-17-2018 <br />1/17118 <br />eview <br />ROGER <br />02:32 PM <br />GMT <br />The applicant has coverage with the Alliant Property Insurance <br />https:Hisource.fema.gov/emmie/viewApplir4l c2Je=navigatable&pageName=&vo,i..• 7/26/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.