Laserfiche WebLink
EXHIBIT 1 <br />Paving • All new paving and walkways shall be constructed with concrete <br />(2,000 PSI @ 28 days). <br />• Driveways shall be reinforced with wire mesh. Sawn expansion - <br />contraction joints shall be placed every 8 feet in both directions. <br />• All paving and walkways shall be finished with a light broom texture. <br />• All walkways shall be at least 3 feet wide. Sawn expansion -contraction <br />joints shall be placed every 4 feet. <br />Landscaping & Irrigation • To the extent possible and practical all new landscaping shall be <br />drought resistant. <br />• When a lawn is being replaced, the new lawn area shall be reduced to <br />aid in the reduction of water consumption. <br />• New irrigation controllers shall be weather or sensor based and EPA <br />Water -Sense qualified. <br />• All new irrigation systems shall be designed to conserve water. <br />Fences, Walls & Gates • All new wood fences shall be made from good quality materials. <br />They shall be properly supported with 4X4 pressure treated posts (8 feet <br />O.C.) and 2X4 rails (top and bottom). The posts shall be embedded in a <br />concrete footing at least 18" deep. <br />• All new block walls shall be constructed with 6X8X16 concrete block. <br />They shall be properly supported by a continuous footing and <br />reinforced with steel bar. <br />mum Standard • Roofs shall be safe and structurally sound. <br />• Roof coverings shall be intact and watertight. <br />• Roofing metal and flashing shall be intact and rust free. <br />• Gutters and downspouts shall be intact and rust free. <br />• Roof coverings with five or less vears of useful life shall <br />Rehabilitation • Roofs that do not meet the minimum standard shall be replaced. <br />Practical, cost effective repairs are acceptable as long as compliance <br />with the minimum standard will be achieved. <br />• The replacement of roofing includes the replacement of all metal (roof <br />jacks and flashing). <br />• Gutters and downspouts shall be installed to properly discharge rain <br />water run-off. <br />Roof Coverings • 25-year, 3-tab, self-sealing composition shingle. Built-up membrane (hot <br />mop) system on all flat roofs. <br />• Lighter colored coverings are preferred for enerqv efficiencv. <br />DECKS / BALCONIES I RAILING <br />Minimum Standard • Safe, structurally sound and watertight. <br />Rehabilitation • Decks, balconies and railing that do not meet the minimum standard <br />shall be replaced. Practical, cost effective repairs are acceptable as long <br />as compliance with the minimum standard will be achieved. <br />Finishes • Zero or low VOC primers, paint and coatings. <br />EXT. STEPS / STAIRWAYS / RAILING <br />City of Santa Ana Community Development Agency <br />Request for Proposals for Affordable Housing Development <br />Pa a 28 <br />80�-32 <br />