My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - PH RFP AFFORDABLE HOUSING DEV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
80A - PH RFP AFFORDABLE HOUSING DEV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:24:14 PM
Creation date
6/27/2019 5:07:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
80A
Date
7/2/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />• EPA Energy Star qualified. <br />Minimum Standard • Homes built before 1978 must comply with 24 CFR Part 35 Subpart J <br />and HUD's Lead Safe Housing Rule regarding the evaluation and <br />control of lead -based paint hazards. <br />• All exterior paint shall be intact and free of corrosion. <br />• Five or more years of practical utility. <br />Rehabilitation • All surfaces to be painted shall be prepared properly. All loose material <br />and peeling paint shall be removed. <br />• All holes and cracks shall be filled and finished so that they blend into the <br />surrounding area. <br />• All stucco surfaces to be painted shall receive a complete and even <br />coverage of stucco paint. <br />• All wood surfaces to be painted shall receive a complete and even <br />coverage of flat exterior paint. <br />• Poor workmanship will not be tolerated. <br />New Paint • Reputable manufacturer. <br />• Highest quality available. <br />• Zero or low VOC paint, caulking and fillers. <br />Minimum Standard • Safe and structurally sound. <br />• All plaster, drywall and paneling shall be safe and intact. <br />Rehabilitation • Walls and wall coverings that do not meet the minimum standard shall <br />be replaced. Practical, cost effective repairs are acceptable as long as <br />compliance with the minimum standard will be achieved. <br />• If the project involves a gut rehab, the attic, walls and floor on raised <br />foundations shall be insulated. <br />Standard • Safe, sound and sanitary. <br />• Five or more vears of Drai <br />Rehabilitation Floor coverings that do not meet the minimum standard shall be <br />replaced. Practical, cost effective repairs are acceptable as long as <br />compliance with the minimum standard will be achieved. <br />Replacement Floor • Carpet & Pad (Reputable manufacturer, recycled materials). <br />Coverings • Resilient Flooring (Reputable manufacturer, 10 year wear warranty). <br />• Ceramic Tile (Reputable manufacturer) <br />INTERIOR DOORS <br />Minimum Standard <br />• Safe, sound and in good working order. <br />• Five or more years of practical utility. <br />Rehabilitation <br />• Interior doors that do not meet the minimum standard shall be replaced. <br />Practical, cost effective repairs are acceptable as long as compliance <br />with the minimum standard will be achieved. <br />Replacement Doors & <br />• Doors (Reputable manufacturer, masonite, raised panel). <br />Hardware <br />• Hardware (Reputable manufacturer, lifetime finish). <br />INTERIOR PAINT <br />City of Santa Ana Community Development Agency <br />Request for Proposals for Affordable Housing Development <br />Page 30 <br />80A-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.