COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO. 19-6942: LOCAL STREET <br />PREVENTATIVE MAINTENANCE FY 2018-19 <br />Construction Contract <br />$ °1,716,649:00 <br />Contract Administration, Inspection and Testing <br />$ 115,351.00- <br />Contin encies <br />$ 68,000.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ —1,900,000.00 <br />=rlC11:3hi! <br />23A-55 <br />