EXHIBIT 4 <br />1 st Amendment to Scope of Work <br />Jamboree has incurred significant increases to the construction budget for the Santa <br />Ana Veterans Village due to unforeseen conditions that occurred after the start of <br />construction. Jamboree has had the following construction change orders: <br />Change Order #1: Demolition of unforeseen conditions. During excavation, a <br />double layer of asphalt was discovered. Specifically, during the demolition of <br />existing asphalt and concrete pavements for the project, a second buried layer of <br />asphalt was discovered beneath the driveway section of the Northeast parking <br />lot. Due to it being buried, this material was not shown on the geotechnical <br />report; thus, the $67,841 cost associated with the demolition and removal of this <br />material was not reflected in Jamboree's initial development budget. <br />Change Order #2: Treatment and removal of contaminated soil that was <br />discovered as part of the soils management plan. During recent grading <br />activities, approximately 400 cubic yards of contaminated soil was encountered <br />onsite. The discovery of contaminated soil resulted in a $35,271 added to <br />Jamboree's development budget. <br />Change Order #3 & #4: Soil treatment for elevated moisture content caused by <br />heavy rain. Consecutive days of inclement weather have posed yet another <br />challenge. The stockpiled soil contained a high moisture content and needed to <br />be air-dried prior to it being treated onsite. The cost to air dry the contaminated <br />soil was $58,176. <br />25B-17 <br />