Laserfiche WebLink
STREET REHAB PROJECT N18-16 <br />MACARTHUR BLVD (SANTA ANA RIVER TO HARBOR BLVD) <br />(SSA <br />1 <br />DescriptionUnit <br />(Mobilization <br />L.S. <br />City of <br />Unit <br />Total <br />City of <br />Total <br />Costa Mesa <br />rice <br />$6,250.00 <br />Amount <br />$6,250.00 <br />Santa Ana <br />uanti r <br />1 <br />Amount <br />$625.00 <br />uanti <br />I 1 <br />2 <br />3 <br />Cold Mill (2- Min Depth) <br />Removal & Reconstruct Asphalt Concrete <br />(6' Min Depth, Including excavation) <br />S.F. <br />TON <br />229,500.00 <br />517.39 <br />$024 <br />$138.00 <br />$55,080.00 <br />$71,399.48 <br />37,000 <br />$8,880.00 <br />4 <br />Type'D- Asphalt Concrete Leveling (Paving Machine) <br />TON <br />$120.00 <br />$0.00 <br />5 <br />Type'C' Asphalt Concrete Overlay (Paving Machine) - Surface Course <br />TON <br />$69.00 <br />$0.00 <br />6 <br />Asphalt Rubber Hot Mix (AHRM) Surface Course <br />TON <br />3,449.25 <br />$81.00 <br />$279,389.25 <br />470.0 <br />$38,070.00 <br />7 <br />8 <br />jAdjust Manhole to Grade <br />jAdjusl Water Valve to Grade <br />EA. <br />EA. <br />13.00 <br />16.00 <br />$685.00 <br />$735.00 <br />$8,905.00 <br />$11,760.00 <br />5 <br />2 <br />$3,425.00 <br />$1,470.00 <br />9 <br />IInstall Blue Raised Pavement Markers (BRPM) <br />EA. <br />I <br />$16.00 <br />$160.00 <br />10 <br />11 linstall <br />Install Type E Traffic Signal Loops <br />Type D Traffic Signal Loops <br />EA <br />EA <br />9 ()Q <br />32.00 <br />I $212 00 <br />$275.00 <br />$1,908,00 <br />$8,800,00 <br />1 <br />2 <br />$212.00 <br />$550.00 <br />12 Ilnstall <br />13 (Adjust <br />Lane Markings, Slriping,Pavement Legends, and Raised <br />Pavement Markers (RPM) <br />and Reset Existing Survey Monuments and Ties <br />L S I <br />E.A. <br />1 <br />3.00 <br />$2,500.00 <br />5360.00 <br />$2,500.00 <br />$1,080.00 <br />1 <br />$250.00 <br />14 <br />Traffic Control <br />L.S. <br />1 <br />$3,250.00 <br />$3,250.00 <br />1 <br />$325.00 <br />STREETTOTAL <br />$450,481.73 <br />STREETTOTAL <br />$53,807.00 <br />110% <br />Contingency <br />$5,380.70 <br />10%Construction Management <br />$5,380.70 <br />GRANDTOTAL <br />S410,481.731 <br />$64,568.40 <br />PROJECT GRAND TOTAL <br />$515,OSO.13 <br />25D-12 <br />