Laserfiche WebLink
Scope <br />of <br />Services <br />75 <br />yn <br />�Sg <br />e <br />N <br />m <br />� <br />m <br />0. <br />S <br />Relevant Projects <br />co <br />g <br />o` <br />i <br />IrCO) <br />r'X <br />U <br />a <br />a <br />m <br />1.405 Design -Build Improvement Project, Orange County <br />Transportation Authority OCTA) — Orange C unty, CA <br />The project includes adding one regular lane In each direction from Euclid Street to 1-605, making improvements <br />to freeway entrances, exits and bridges, and will also implement Express Lanes that expands the existing HOV <br />lane from one lane to two lanes in each direction from SR-73 to 1-605. Iteris is responsible for the design of <br />the Caltrans ITS field infrastructure, temporary ITS field Infrastructure supporting maintenance of traffic during <br />construction, toll system infrastructure and coordination, street lighting, and signal design at 42 intersections for <br />the various agencies throughout the corridor. Iteris is also responsible for supporting traffic maintenance during <br />construction through the development and the Implementation of the Transportation Management Plan (TMP), <br />which involves coordination with all affected corridor agencies to maintain mobility and safety of all travelers. <br />The TMP includes detour routes and supporting traffic analysis for closures of 17 arterial overcrossings and <br />over 35 freeway ramps with Iteris staff acting as the project Traffic Manager. Iteris has also provided installation, <br />integration and maintenance of the technology infrastructure to support the temporary ITS systems including a <br />corridor level temporary wireless network, CCTV cameras, and radar detection to manage traffic. Iteris is also <br />providing the iPeMS® platform supporting the project its traffic management operations during construction. <br />Reference: Scott Lucas, Senior Project Manager, HW Lochner, 1245 Brickyard Road, Suite 400, Salt Lake City, <br />UT, 84106, (714) 415-5802, slucas@hwlochner.com <br />Dates of Completion: 2017 - In Progress 2019 <br />Caltrans D12 : Design of an ICM System for the Orange <br />County Triangle — Orange County, CA <br />Iteris was selected by Caltrans D12 to lead the planning and design of the innovative Orange County Triangle <br />ICM project Involving 1-5, SR-91 and SR-57 freeways, known as the Platinum Triangle. This project is setup as a <br />Task Order based project to provide for the systematic planning and development of the triangle ICM corridors in <br />phases. The three freeways are heavily travelled with commuter traffic but also are located in an area with a high <br />concentration of special events with multiple theme parks, baseball stadium, sports arena complex, convention <br />center and other attractions including Disneyland. This project includes the design of upgraded ITS freeway <br />elements such as HD video surveillance, upgraded CMS, upgraded communication infrastructure, the state of <br />the art network control system for Caltrans Lighting Poles, deployment of performance measure systems and <br />several roadway modernization and safety Improvement elements. This project will be upgrading all the ramp <br />meter systems and traffic signal intersections at the ramp entry/exit points as well as developing the state of the <br />art adaptive ramp metering algorithms. This project involves the project development process for Caltrans from <br />PAED development, environmental documentation, PS&E packages and construction support services. <br />Reference: Mohammad Iraki, Caltrans, 6681 Marine Way, Irvine, CA 92618, (949) 936-3486, <br />miraki@dot.ca.gov <br />Dates of Service: 2017 - 2018 Construction ongoing until 2023 <br />DUE! 3 <br />SCOPE OF SERVICES & SCHEDULE <br />Cannon's Scope of Services has been addressed within the understanding of need on page 2 of this proposal. <br />Upon receipt of notice from the City of a position title to be filled, Cannon will supply a resume for one or more <br />qualified candidates within one to three weeks of receipt of notification. <br />Upon receipt of notice from the City to interview the qualified candidate, Cannon will make the candidate <br />available within one to two weeks of receipt of notification. <br />