Gary Solsona, PE, QS®
<br />Project Manager
<br />Education:
<br />M, Civil Engineering, California State Polytechnic University, Pomona, 2001
<br />Licenses & Certifications:
<br />Professional Civil Engineer, CA No. 68420
<br />Qualified SWPPP Developer / Practitioner No. 23466
<br />Years of Experience: 17
<br />Mr. Solsona has 17 years of civil engineering experience in public works design, consisting of award -winning
<br />roadway widening, street rehabilitation and Intersection improvements, sewer, storm drain, sound wall and
<br />retaining wall design, preparation of traffic control plans and project study reports, and is recognized in
<br />the industry as an ADA design specialist. His proactive approach is carried out seamlessly through project
<br />management, engineering design development, and construction support services to public agencies
<br />throughout Southern California and he has a proven track record In providing innovative, cost -saving, and
<br />sustainable solutions (such as alternative pavement rehabilitation methods, Including full depth reclamation and
<br />cold -in -place -recycling) on numerous street improvement projects for major arterials and residential streets,
<br />RELEVANT EXPERIENCE
<br />Gary served as Project Manager and/or Project Engineer for the following relevant projects:
<br />• City of Santa Ana On -Call Plan Check Services
<br />• Anaheim Modjeska Park Underground Storm Water Detention and Infiltration System, City of Anaheim
<br />• City of Chino Plan Check Services
<br />• City of El Monte'As Needed Plan Check Services, El Monte, CA
<br />• On -Call Surveying, Civil Design, Engineering, and Planning Services, Rancho Palos
<br />Verdes, CA
<br />• Jamboree / Main Intersection Improvement Project, 1405 NB On -Ramps to Kelvin,
<br />Irvine, CA
<br />• Farragut Avenue Improvements, Moreno Valley, CA
<br />• Cerritos Avenue Sidewalk Gap Closure, Anaheim, CA
<br />• Newport Beach Concrete Streets Reconstruction, Newport Beach, CA
<br />• Balcom Avenue Storm Drain Repairs at BNSF Railroad, Fullerton, CA
<br />• QC review of specifications for University Drive Widening Project,
<br />Irvine, CA*
<br />• Berkeley Avenue Street Reconstruction, Fullerton, CA
<br />• Nutwood Avenue & Chapman Avenue Street Rehabilitation, Fullerton, CA*
<br />• Brea Boulevard Slope Repairs, Fullerton, CA*
<br />• Sunset Strip Beautification, West Hollywood, CA*
<br />• Town Center Infrastructure Improvements, Phases 1 & 2, Yorba Linda, CA*
<br />• ADA Ramp Improvements, Phases 9 & 10, Lake Forest, CA*
<br />• 8th Street Improvements, Hermosa Beach, CA*
<br />• Bastanchury Road Rehabilitation, Yorba Linda, CA*
<br />*Work performed prior to Cannon
<br />
|