My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - ENGINEERING TECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/16/2019
>
25F - AGMT - ENGINEERING TECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:04:18 PM
Creation date
7/11/2019 4:58:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
7/16/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Downey <br />Project Descriptions: GK & Associates is currently providing a variety of construction management <br />and Inspection services for multiple CIP projects in the City of Downey. Past and current projects vary <br />in size from minor traffic signal upgrades and modifications to City-wide Fiber Optic Installations to full <br />intersection and roadway widening. These projects include street rehabilitations, storm drain systems, <br />major utility "undergrounding" and ADA compliance elements. When a project involves federal <br />funding, GK & Associates' Inspectors are responsible for maintaining field compliance requirements <br />as well as conducting federally mandated contractor/employee interviews for "end of project" and <br />certified payroll audits. Quality assurance activities involve inspection of the work Including Traffic <br />Signal Upgrades, Street Lighting, A.0 pavement, dry utilities, water, sewer, storm drain, curb and <br />gutter, and sidewalks. <br />GK & Associates has worked on multiple projects for the City of Downey, Including the Paramount <br />Blvd. Fiber Optic Installation Project - Phase 1 & 2; the Florence Ave Fiber Optic City -Wide Installation <br />Project, the Beliflowertimperial Hwy Improvement Project; Firestone Blvd. Water Pipeline <br />Improvements; Lakewood Water Pipeline Improvements; Street Improvement and Utility <br />Undergrounding Project and multiple traffic signal modifications and new installation projects. <br />Reference: Mr. Edwin "Ed" Norris <br />Director Public Works <br />City of Downey <br />11111 Brookshire Ave. <br />Downey, CA 90241 <br />(562)904-7109 <br />enonis@downeyca.org <br />Mr. Deal Gutierrez <br />Principal Civil Engineer <br />City of Downey <br />11111 Brookshire Avenue <br />Downey, CA 90241 <br />(562)271-3188 <br />dgutierr@downeyca.org <br />City of Downey Project Site Pictures <br />361Page <br />25F-188 <br />
The URL can be used to link to this page
Your browser does not support the video tag.