1. STATEMENT OF QUALIFICATIONS 1.9
<br />Roads for Efficient & Sustainable Road Maintenance, Construction & Reconstruction Projects.
<br />• Cactus Avenue and Nason Street Improvements and 136' Span Bridge Project (SLPP Funded), City
<br />of Moreno Valley ($21M): Provided construction management, resident engineer, Inspection, and office
<br />engineer services. AWARD: This project was recognized with a project achievement award by the
<br />Construction Management Association of America (CMAA) for Construction Management Services under
<br />the Public Works Category for $11 M-$50M ranged projects.
<br />• Lugo Park, Soccer Field and Park Improvements (Federally Funded), City of Cudahy ($1.6M): Prepared
<br />the PS&E as well as provided construction management and inspection services for a regulation soccer field
<br />with artificial turf on existing baseball field, DG walking path, landscaping, parking lot expansion, concrete
<br />plaza, lighting, drainage, bathroom and concession stand ADA Improvements.
<br />• Campus Parkway Roadway Project, City of San Bernardino ($6M): Prepared Design/PS&E as well as
<br />provided construction management and Inspection services for the project. Improvements included street,
<br />water, sewer, storm drain, landscape, street lighting, traffic signal, and signing and striping.
<br />• CSUSB (Cal State SB University) San Bernardino Campus Access Road ($5m): Prepared PS&E and
<br />provided construction administration for the project. Improvements included approximately 1-mile street,
<br />water, landscape, grading, drainage, street lighting and various other improvements.
<br />• SR2S, BTA and Pavement Rehabilitation Project (State Funded), City of Temple City ($2M): Prepared
<br />Design/PS&E package, as well as provided CM/Resident Engineer, Inspector, Office Engineer Services.
<br />Project involved pavement rehabilitation, curb and gutter, sidewalk, traffic signals, utilities, and other misc.
<br />improvements.
<br />• Sewer upgrade Project ($2m), City of San Bernardino: Prepared PSE for upgrade of main sewer lines at
<br />various locations per the City's Sewer Master Plan.
<br />• City of San Bernardino, Northpark Boulevard Sewer Extension: Half mile gravity sewer main extension
<br />for University Park Subdivision in the City of San Bernardino; Project required special structural designs and
<br />encroachment permitting for crossing 100' aqueduct right-of-way.
<br />• City of San Bernardino, University Park Storm Drain: Design of storm drain system with pipes ranging in
<br />size from 18 to 60 inches and trapezoidal channel design for 4500 cfs.
<br />• University of California, Riverside, West Campus Infrastructure: Prepared West Campus Infrastructure
<br />Development Design/Study, which identified utility and surface infrastructure requirements, and how these
<br />Improvements could be phased to accommodate proposed campus growth, for an area of 236 acres to
<br />support approx. 5 million gross square feet of academic, research, support, and student housing facilities.
<br />• University Development Master Plan (San Bernardino): Prepared Master Plan for approximately 200-
<br />acre site in association with the City of San Bernardino, Watson Development and Cal -State SB for the
<br />development of 200 residential, mixed use, live -work, retail, office and student housing, educational and
<br />training facilities and offices for Cal State SB University.
<br />• San Elijo Hills Specific Plan (San Bernardino): Provided planning, engineering, surveying services for
<br />the design and development of the 2,000-acre 3,500 dwelling unit Specific Plan and Master Tentative Map
<br />In the City of San Marcos.
<br />• Arrowhead Springs Specific Plan (including annexation into the City) (San Bernardino): Prepared
<br />Master Plan for approximately 4,000-acre site at the foothills of San Bernardino Mountains, and includes
<br />1,500 to 2,000 residential units, 1,000,000 square feet of commercial and office space, 199-acre/18-hole
<br />public golf course, renovation and reuse of the historic Arrowhead Springs Hotel with a new 115 room annex,
<br />new 300-room hotel, a conference center, 14-acre corporate office area.
<br />• Traffic and Transportation Engineering: Transtech is currently providing various Traffic and
<br />Transportation Engineering contract services to several agencies and serves as contract traffic engineer for
<br />a number of municipalities. We provide technical expertise and recommendations, and conduct necessary
<br />surveys and prepare reports on traffic related issues, and present them at Commission and/or Council
<br />Meetings. We prepare traffic safety and calming studies, stop and signal warrants/studies, traffic impact
<br />PROPOSAL FOR TerwsTECh
<br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO.19-045
<br />25F-221
<br />
|