APPENDIX -RESUMES 6
<br />MICHAEL ACKERMAN, PE, QSD, QSP, QISP, Sr. Engineer
<br />EDUCATION
<br />• Bachelor of Science in
<br />Engineering, the
<br />University of Iowa
<br />• Land Development
<br />Desktop, AutoCAD Civil
<br />3D, and Microstation
<br />Certification - Westech
<br />College
<br />REGISTRATION
<br />• Registered Civil
<br />Engineer
<br />CERTIFICATIONS
<br />• Resident Engineer
<br />Academy, Caltrans
<br />• Water Pollution Control
<br />Compliance on
<br />Construction Sites for
<br />Resident Engineers,
<br />Caltrans
<br />• Asphalt Pavement
<br />Fundamentals: Design,
<br />Construction, and
<br />Rehabilitation
<br />• Construction Program
<br />Management
<br />Workshop, FHWA
<br />• Field Office Procedures
<br />Course, Caltrans
<br />• California Work Zone
<br />Inspection — High
<br />Speed, Caltrans
<br />Mr. Ackerman has over 20 years of experience.
<br />At Transtech, he has been working as a Sr. Engineer at various Transtech
<br />City Engineering Contracts. He has served at various Cities under
<br />Transtech's City Engineering Contracts, including Temple City,
<br />Huntington Park, and Alhambra. Mr. Ackerman managed Engineering
<br />and CIP attended and coordinated with COG Regional Transportation
<br />Planning, GWMA Gateway Water Management Association, and Los
<br />Angeles Upper Reach 2 Storm Water Management Group. He is very
<br />familiar with the local and regional agencies and goals. He has a broad
<br />knowledge of municipal government operations, including preparation and
<br />presentation of staff reports/resolutions to city councils, committees and
<br />interaction with public, various city departments, city council and other
<br />governmental agencies.
<br />Mr. Ackerman's experience also Includes working at Caltrans and
<br />other agencies:
<br />Caltrans District 8: Mr. Ackerman was a civil transportation engineer for
<br />Caltrans District 8 where he was involved in the design and construction
<br />of various projects.
<br />• Construction Division: In the Construction Division, Mr. Ackerman
<br />was Resident Engineer for various projects, including:
<br />o Watson Wash Bridge Replacement Right (Rte 40)
<br />o Replacement of Drains and Earthwork (Rte 40)
<br />o Fenner Overhead Bridge Replacement (Replacement of two
<br />bridges over BNSF Railroad, Rte 40).
<br />Design Division: Designed plans, specifications, and estimates for the
<br />rehabilitation of Route 10 freeway from the Riverside/San Bernardino
<br />County line to Beaumont.
<br />Traffic Operations Division: Performed studies and analyses to
<br />interpret and mitigate above average accident volume areas on
<br />highways and freeways. Also, he performed traffic studies.
<br />City of San Bernardino: Mr. Ackerman held the position of Associate
<br />Engineer under City Engineer of the Division of Public Works in the
<br />Department of Development Services. He was involved in many projects
<br />including Development Review and Plan Check, design and review of
<br />Street Improvement Plans, Rough and Precise Grading Plans, Sewer
<br />Plans, Storm Drain Plans, Street Lighting Plans, Storm Water Pollution
<br />Prevention Plans, Water Quality Management Plans, Geotechnical
<br />Reports, and Hydrology/Hydraulic Studies, land development, industrial,
<br />commercial, residential, and transportation development projects
<br />including Tract and Parcel Maps. He also directed and performed plan
<br />check of improvement plans submitted by developers to the City. Also, he
<br />represented the City of San Bernardino at the South Tehachapi
<br />Management Team meetings, coordinated with San Bernardino County
<br />Flood Control and FEMA for the certification of City levees and updating
<br />of the Flood Insurance Rate Maps (FIRM), and oversaw permitting and
<br />I,.,.: I
<br />PROPOSAL FOR TRANSiECH
<br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO. 19.045
<br />25F-246
<br />
|