Laserfiche WebLink
procedures Id -existing water malni; Design -included various street <br />redesign/construction locations Budget of $8 5M. <br />Crescent Street Water Well'- Design/build a water well fo a depth of 1;200 <br />ifeet'including'a 250 hp electric moto_t antl 500 lineal feet of 12-inih p.vc c- <br />INTERWEST 900 pipellne._Into the distribution system with'a:1,500.GPM capacity„ <br />CONSUL_LING In'duding SCQDA connectlons Intq •Cityls 'systerp fgr.. fully. automatic <br />GRO'UP,' <br />operations Budget was$1°Sip <br />'tvww.ln (erwestgi[i.com- <br />L Water,7rans/Dlstrltiutioo'Manageri <br />1992—.1993 'Oty of Anaheim <br />Principal Watei Engineer, <br />1988 =1992 city-, f Anaheim <br />i'Associate Engineer <br />1982 —1986 '-Mes-a Consolidated Water District <br />Page 94' <br />25F-96 <br />