Laserfiche WebLink
EXHIBIT 4 <br />COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 17-2675: Civic Center Stormwater Lift <br />Stations <br />Construction Contract <br />$ <br />1,022,000.00 <br />Contract Administration <br />$ <br />66,100.00 <br />Inspection and Testing <br />$ <br />87,200.00 <br />Contingencies <br />$ <br />154,700.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />1,330,000.00 <br />23B-35 <br />