My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - WATER QUALITY RPT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/16/2019
>
75C - PH - WATER QUALITY RPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:59:24 PM
Creation date
7/11/2019 5:56:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
7/16/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 Public Health Goals (PHGs) Report <br />City of Santa Ana <br />1.0 Introduction <br />Under the Calderon -Sher Safe Drinking Water Act of 1996 public water systems in <br />California serving greater than 10,000 service connections must prepare a report <br />containing information on 1) detection of any contaminant in drinking water at a level <br />exceeding a Public Health Goal (PHG), 2) estimate of costs to remove detected <br />contaminants to below the PHG using Best Available Technology (BAT), and 3) health <br />risks for each contaminant exceeding a PHG. This report must be made available to <br />the public every three years. The initial report was due on July 1, 1998, and <br />subsequent reports are due every three years thereafter. <br />This report has been prepared to address the requirements set forth in Section 116470 <br />of the California Health and Safety Code. It is based on water quality analyses during <br />calendar years 2016, 2017, and 2018 or, if certain analyses were not performed during <br />those years, the most recent data available. The report has been designed to be as <br />informative as possible, without unnecessary duplication of information contained in the <br />Consumer Confidence Reports, which are mailed to customers by July 1st of each year. <br />There are no regulations explaining requirements for the preparation of PHGs reports. <br />A workgroup of the Association of California Water Agencies (ACWA) Water Quality <br />Committee has prepared suggested guidelines for water utilities to use in preparing <br />PHGs reports. The ACWA guidelines were used in the preparation of this 2019 report. <br />These guidelines include tables of cost estimates for BAT. The State of California <br />(State) provides ACWA with numerical health risks and category of health risk <br />information for contaminants with PHGs. This health risk information is appended to the <br />ACWA guidelines. <br />City of Santa Ana 1 2019 PHGs Report <br />75C-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.