Laserfiche WebLink
e. Cooperate with local authorities relative to handling traffic through the area <br />and must make arrangements relative to keeping the working area safe and <br />clear of vehicles. <br />Provide a towed or mounted arrow board for all lane closures. <br />g. Note most work should be performed without obstructing the flow of traffic <br />whenever possible. If lane closure is required, abide by WATCH manual. <br />& Performance during inclement weather <br />During periods of inclement weather, i.e. rain/wind; Contractor's workforce shall <br />accomplish work not affected by such weather, Le. litter pick up/spent blossom <br />removal, preventative maintenance, etc. <br />a. Contractor shall stake and retie trees as required, <br />b. Drains shall be checked and cleaned as necessary. <br />C. Contractor shall remove all branches and debris resulting from inclement <br />weather. <br />d. Contractor may be required to perform additional clean-up tasks due to <br />inclement weather. <br />9. Recycling <br />All organic waste (including leaves, grass clippings, brush, branches, and treeparts) <br />resulting from work performed under this contract shall be recycled through <br />composting or processing for use as mulch. Organic waste cannot be taken to the <br />landfill. The names and addresses of the licensed green -waste composting or <br />processing companies, and haulers, along with the tonnages used and receipts, shall <br />be provided to the Projects Manager or designee in a monthly written report and an <br />annual written report. <br />10. Disposal <br />At least 100% of all landscape debris will be disposed of through a landscape material <br />recycling center or reused in some manner. The Contractor shall dispose of all <br />cuttings, weeds, leaves, trash, and other debris from the operation as work <br />progresses. The City shall not be responsible for the disposal. Contractor shall pay <br />all disposal fees and provide documentation evidence of recycling to Include location, <br />tonnage, etc. on a monthly basis to the City. <br />Contractor shall dispose of all trash and debris. Contractor shall dispose of all <br />landscape debris through a landscape material recycling center such as Tierra Verde <br />Industries. Contractor shall not dispose of landscape debris in a landfill without prior <br />approval from the Projects Manager or designee. Contractor shall pay all disposal <br />fees and submit a copy of receipt as part of the landscape monthly reports. At no <br />