My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ONE BROADWAY PLAZA DEV.- EXHIBITS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/06/2004
>
ONE BROADWAY PLAZA DEV.- EXHIBITS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 12:33:14 PM
Creation date
7/23/2019 8:38:38 AM
Metadata
Fields
Template:
City Clerk
Item #
75E
Date
7/6/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One Broadway Plaza Project Mitigation Monitoring Program <br />MITIGATION MONITORING PROGRAM FOR THE <br />ONE BROADWAY PLAZA PROJECT <br />PURPOSE <br />On January 1, 1989, California State Assembly Bill 3180 (AB 3180) became effective. AB 3180 <br />requires state and local agencies to adopt programs for monitoring and reporting of implementation <br />of mitigation measures addressing significant adverse environmental impacts of projects agencies <br />approve subject to the California Environmental Quality Act (CEQA). Consistent with the <br />requirements of AB 3180 and the CEQA Guidelines, this Mitigation Monitoring Program (MMP) <br />was developed by the City of Santa Ana for use in monitoring the implementation of the mitigation <br />measures incorporated in the proposed One Broadway Plaza project. <br />The City of Santa Ana has the authority to require and enforce the provisions of AB 3180 and the <br />CEQA Guidelines consistent with its existing police powers. As lead agency for the environmental <br />documentation for the proposed One Broadway Plaza project, the City is also responsible for <br />approving the MMP and for accepting the written report documenting completion of the <br />implementation of the project mitigation measures. In general, the City of Santa Ana Public Works <br />Agency (PWA) and Planning Department would be responsible for overseeing the implementation <br />of these mitigation measures and for approving measures as complete. <br />DEVELOPMENT OF THE MMP <br />The basis of the MMP is the mitigation measures identified as follows: <br />By environmental impact category as documented in Section 3.0 (Existing Conditions, Impacts <br />and Mitigation Measures) of the Environmental Impact Report (EIR) for the One Broadway <br />Plaza project. <br />By environmental impact category for measures that were refined or added to the project <br />mitigation measures in response to comments received from agencies and members of the <br />general public on the Draft EIR. <br />MITIGATION MONITORING PROGRAM FOR THE PROPOSED ONE BROADWAY <br />PLAZA PROJECT <br />Table 1 provides the following information: <br />■ A list of all mitigation measures from Section 3.0 of the Draft EIR and the refined measures <br />from the Responses to Comments Report. <br />■ The implementation schedule for each measure. <br />• The City of Santa Ana Department or Departments responsible for reviewing and approving the <br />documentation regarding implementation of each measure. <br />EXHIBIT 12 <br />U: I VFregosol WP51 WEPORTSI One Broadway MMP. doe <br />June 14, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.