My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRISWOLD INDUSTRIES
Clerk
>
Contracts / Agreements
>
G
>
GRISWOLD INDUSTRIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2022 11:10:18 AM
Creation date
7/23/2019 3:39:42 PM
Metadata
Fields
Template:
Contracts
Company Name
GRISWOLD INDUSTRIES
Contract #
A-2019-102
Agency
PUBLIC WORKS
Council Approval Date
7/2/2019
Expiration Date
7/1/2022
Insurance Exp Date
4/1/2023
Destruction Year
2027
Document Relationships
GRISWOLD INDUSTRIES (2)
(Amended By)
Path:
\Contracts / Agreements\G
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 18-052 <br />FLOW CONTROL VALVE MAINTENANCE PROGRAM <br />rebuilds/rehabilitations should be performed in which the main valve and its respective pilot <br />controls are cleaned internally, all rubber parts are replaced, and all metal parts replaced where <br />needed. All repairs and rehabilitations shall be made in accordance with Cla-Val guidelines and <br />as directed by the City. <br />The Contractor shall be factory trained in maintaining all piloting systems offered by Cla-Val and <br />shall fix/repair all piloting systems in accordance with Cla-Val guidelines and as directed by the <br />City. Work under this section shall also include full valve replacement complete with all <br />necessary pilot systems and/or electronic controls. <br />Valves listed in Appendix A are representative of the majority of the Cla-Val valves in use in the <br />City but is not a complete listing. For bidding purposes, assume all repair items on the bid sheet <br />do not include repairs of the pilot control systems. The City acknowledges that additional costs <br />will be incurred for pilot system repairs and will vary depending upon the type of piloting system <br />on each valve. Assume that a full repair of the valve will include costs for replacement of all parts <br />that could be replaced in a standard Cla-Val diaphragm valve. <br />For bidding purposes, assume repair of the following components; replacement of disk and seat <br />on Model 90-01 for the various sizes as listed on the Fee Schedule. <br />III. NEW VALVE (BID ITEMS 10-11) <br />If the Contractor has determined rehabilitation of a valve system is not feasible or at the City's <br />direction, replacement of the valve with a new valve shall take place. Furthermore, if the cost to <br />repair the valve exceeds 50% of the cost to replace, replacement of the valve with a new valve <br />shall take precedence. When work includes the replacement of valves, City staff will remove the <br />existing valve and install the new replacement valve. The consultant/contractor will assist with <br />the specification of the new replacement valve, supply the new replacement valve, and assist in <br />the calibration and testing of the new replacement valve upon successful installation by City <br />staff. <br />IV. VALUE ADDED RELATED SERVICES <br />The Contractor may propose additional related services that the City has not specifically <br />identified in this RFP to accomplish the stated goals of this RFP. Value added related <br />services will be considered by the City and may or may not be incorporated in the <br />agreement. All parts and materials must be supplied new and Cla-Valve factory approved. <br />V. PROJECT MANAGEMENT & COORDINATION <br />When a request for service is issued to the City, the Contractor shall issue an estimate to <br />the City's designated project manager. The Contractor shall not proceed with any work without <br />the approval of the City's designated project manager. Contractors shall invoice the City on <br />a monthly basis for all work performed during the period or provide a one-time invoice at the <br />completion of work issued. Each invoice shall be accompanied by a summary of tasks <br />performed, results and progress on long-term tasks if any. <br />
The URL can be used to link to this page
Your browser does not support the video tag.