My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECONOLITE SYSTEMS, INC. (2)
Clerk
>
Contracts / Agreements
>
E
>
ECONOLITE SYSTEMS, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 3:17:44 PM
Creation date
7/23/2019 4:10:20 PM
Metadata
Fields
Template:
Contracts
Company Name
ECONOLITE SYSTEMS, INC.
Contract #
A-2019-101
Agency
Public Works
Council Approval Date
7/2/2019
Expiration Date
7/1/2022
Insurance Exp Date
6/27/2021
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. List of Signalized Intersections <br />See Attachment 4 for the list of traffic signals, CCTV cameras, flashing beacons, <br />and speed feedback signs. <br />4, Additions to System <br />The Contractor shall maintain additional traffic signals and appurtenant devices as <br />they are added or installed. City will notify the contractor of such addition and the <br />contractor shall include them in the maintenance contract. Cost of the routine <br />maintenance of the new addition will be per contract unit price and will be <br />effective the 1st day of the following month unless stated otherwise in the <br />notification. <br />5, Routine Maintenance <br />The routine maintenance shall be performed on a periodically basis based on type <br />of equipment. <br />(a) Traffic Signal: <br />(i) Maintenance period: <br />The Contractor shall perform a complete inspection and service of each <br />signalized intersection once a month, not less than 25 days or more than 35 <br />days apart, for safety, operation and cleanliness. <br />(ii) Maintenance Tasks: <br />• Cabinets: <br />The Contractor shall clean the cabinets thoroughly on the inside, <br />including all components. The Contractor shall remove all unauthorized <br />external attachments such as notices, posters, signs, etc. and notify the <br />City of any graffiti that is on the signal equipment. It is not the <br />Contractor's responsibility to remove the graffiti <br />o Ventilation system: <br />The Contractor shall ensure that the cabinet's ventilation system <br />is in working order. Fnsure that the Thermostat and Fan <br />operates properly. The air filter shall be replaced and dated <br />every 90 days (regardless of condition). <br />o Controller and Timing: <br />The Contractor shall check controller timing against the tinting <br />sheet and notify the City on any deviation. No timing <br />parameters shall be changed without explicit approval from the <br />City. <br />o Vehicle Detection System: <br />The Contractor shall ensure that the vehicle detection system is <br />fully functional, Maintenance Personnel must be well versed in <br />the use of the different types used by the City, The City utilizes <br />the following types of Detection: <br />■ Loop Detection - Detectors needs to be checked that it is <br />properly detecting vehicles and able to apply calls to the <br />City of Santa Ana RFP 19-023 <br />Page Al-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.