Laserfiche WebLink
ATTACHMENTS <br />STREET REHAB PROJECT#18-16 <br />MACARTHUR BLVD (SANTA ANA RIVER TO HARBOR BLVD) <br />jDescription <br />1 Mobilization <br />_ _1 <br />City of <br />Unit <br />Cos esa <br />L.S. <br />Unit <br />Total <br />City of <br />Total <br />- <br />Price <br />$6,250.00 <br />---- <br />Amount <br />$6250,00 <br />Santa An <br />an it <br />_ <br />n <br />1 <br />_ <br />$625,00 <br />2 'Cold Mill (2" Min Depth) <br />S.F. 22500.00 <br />$0.24 <br />, . <br />37,000 <br />$8,880.00 <br />a <br />Removal & Reconstruct Asphalt Concrete <br />3 i,(8" Min Depth , including excavation) <br />_ <br />TON <br />517.39 <br />$138.00 <br />$71,399.48 <br />4 Type "O" Asphalt Concrete Leveling (Paving Machine) <br />TON j <br />$120.00 <br />$0.00 <br />— <br />5 !Type "C" Asphalt Concrete Overlay (Paving Machine)- Surface Course <br />TON <br />$%00 <br />$0.00 <br />6 Asphalt Rubber Hot Mix (AHRM) Surface Course <br />TON <br />3,449.25 <br />$81.00 <br />$279,389.25 <br />_ <br />470.0 <br />$38,070.00 <br />7 jAdjust Manhole to Grade <br />E,A. 13.00 <br />$685.00 <br />$8,905.00 <br />5 <br />$3,425.60 <br />8 'Adjust Water Valve to Grade <br />E.A. 1 16.00 <br />$735.00 <br />$11,760.00 <br />2 <br />$1,470.00 <br />9 Install Blue Raised Pavement Markers (BRPM) <br />E.A. - <br />10.00 <br />$16.00 <br />$160.00 <br />10 :Install Type E Traffic Signal Loops <br />E.A. g,p0 <br />$212.00 <br />$1,908.00 <br />1 <br />$212.00 <br />11 i Install Type D Traffic Signal Loops _ <br />E.A 1 32.00 <br />$276.00 <br />$8,800.00 <br />�2 <br />$550.00 <br />Install Lane Markings, Striping,Pavement Legends, and Raised <br />12 <br />Pavement Markers (RPM) <br />L.S. 1 <br />$2,500.00 <br />$2,500.00 <br />1 <br />$250.00 <br />uand R <br />13 Adjst Reset Existing Survey Monuments and Ties <br />n <br />EA. 3,pg <br />$360.00 <br />$1,080.00 <br />14 'Traffic Control <br />L.S. 1 <br />$3.250.00 <br />$3,250.00 <br />1 <br />$325.00 <br />STREET TOTAL <br />$450,481.73 <br />STREET TOTAL, <br />$53,807.00 <br />h0%Contingency. <br />10%Construction Management <br />!_ <br />-"�- <br />__ <br />$5,380.70 <br />i <br />�—GRANDTOTALI <br />$450,481.73 <br />GRANDTOTAL <br />$64,568.40 <br />PROJECT GRAND TOTAL <br />$515,050,13 <br />11 <br />