My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - SEWER MAIN IMPROV PROJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
08/20/2019
>
23A - SEWER MAIN IMPROV PROJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 5:38:46 PM
Creation date
8/15/2019 5:32:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
8/20/2019
Destruction Year
2024
Document Relationships
ARAMEXX CONSTRUCTION (2)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 2 <br />Cltywlde Sewer Main Improvements (17-6437), bidding on June 19, 2019 200 <br />PM (Pacific) <br />Printed 07102/2019 <br />Bid Results <br />Type <br />Item Code u0M <br />0ty <br />Unit Pit" <br />Line Total Comment <br />3 <br />Remove Existing Sewer Main and Construct 10" PVC SDR-26 Sewer Main <br />LF <br />400 <br />$129.40 <br />$61,760.00 <br />4 <br />Asphalt Concrete (AC) Paving <br />TN <br />...__........ <br />715 <br />-............ <br />$167.65 <br />,....._.._..,.......... <br />$120,012.76 <br />.... ._..._......_..._......_ <br />5 <br />Asphalt Rubber Hot Mix (ARHM) (T=2") <br />TN <br />62 <br />$199.34 <br />$16,346.88 <br />6 <br />Cold Milling (T=2°) <br />SF <br />6600 <br />$1.81 <br />$11,765.00 <br />7 <br />PCC Goss -Gutter (Arterial Streets) <br />SF <br />350 <br />$24.64 <br />$8,694.00 <br />8 <br />Construct New P.C.C. Sewer Manhole <br />EA <br />15 <br />$4,149.08 <br />$62,236.20 <br />9 <br />Remove F-xisting Manhole Structure <br />EA <br />15 <br />$1,211.60 <br />$18,174.00 <br />10 <br />Construct 4" or 6" PVC Sewer Lateral and Cleanout (Open Trench) <br />EA <br />104 <br />$2,355.66 <br />$244.988.64 <br />11 <br />Construct 4" or 6" HOPE Sewer Lateral and Cleanout (Pipe Bursting) <br />EA <br />............ <br />15 <br />$3,741.82 <br />$56,127.30 <br />12 <br />Connect Sewer Laterals prevloulsy pipe bursted by City Forces <br />._.. _.. <br />... ...,.. ..__,._... _..._ _........ <br />FA <br />.,.....,. <br />7 <br />.. ... <br />$1,772.61 <br />........ _.. <br />$12,408.27 <br />13 <br />CCTV Inspection of New Sewer Main <br />_ ._ <br />.. . _...,... ...... _. ... ............ <br />LF <br />4400 <br />$2.96 <br />$13,024.00 <br />14 <br />CCTV Inspection of New Sewer Laterals (Open Trench/Pipe Burst) <br />EA <br />_..... ....... ..........,......_......... _,........,.._ _.-._... __ <br />126 <br />,................................. <br />$68.77 <br />$8,685.02 <br />_..., .... ,.............. <br />15 <br />Traffic Control <br />_....._._.. , .. <br />LS <br />1 <br />$49.136.78 <br />$49,136.78 <br />16 <br />Signing and Striping <br />LS <br />1 <br />$31.097.00 <br />$31.097.00 <br />17 <br />Imported Baxkfill Material (As Needed)' <br />CY <br />900 <br />$50.00 <br />$45,000.00 <br />18 <br />Additional Potholing (As Needed)' <br />FA <br />10 <br />$1,263.60 <br />$12,636.00 <br />PlanetBlds, Inc. <br />23A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.