PE
<br />Storm Drain • Water o Sewer
<br />Fsra6fished 1983
<br />(714) 632-3975/info@paulusenginee(ng.com
<br />PAULUS ENGINEERING. INC.
<br />PIPELINECONSTRUCTION
<br />REFERENCES: (in alpha order)
<br />RESIDENTIAL:
<br />I. Barry Osborne, Offsite Superintendent, Shea Homes (retired but willing to provide a reference). M (714) 822-
<br />5636: BarD-/.Osborne@SlieaHomes.com
<br />2. Dave Burger, Sr. Construction Manager, Irvine Company, dburaer@irvinecomoanvcom M (714) 791-9257/
<br />O: (714) 673-6327, 550 Newport Center Dr., Newport Beach, CA 92660-701 I
<br />3. Isaac Ayala, Project Manager, Snyder Langston Residential, M(949) 331-0487; iavala@snvderianoston.com
<br />4. John Vandervelde, VP of Operations/Land Development, Shea homes; O (949) 526-8815
<br />Jolin.Vandervelde@SlieaHomes.com
<br />5. Mark Montoya, VP Multifamily, Snyder Langston, M (626) 741-8428/ mmonrova@sl-residential.com
<br />6. Martin Leon, Director of Construction, The Irvine Company, M (949) 279-5034, mleon@irvinecompany.com
<br />7. Mike Rodebaugh, Sr. Dir of Construction & Engineering, Irvine Community Development Company/Irvine
<br />Company,• M (949) 395-1237 / Of (714) 673-6327/ 550 Newport Ctr Dr., Newport Beach, CA 92660.
<br />mrodebauoh@itvinecomoanv com
<br />COMMERCIAL \ INDUSTRIAL REFERENCES;
<br />I. Bob Klaewtanong, Vice President of Development, Sares Regis, M (949) 463-3264, bklaewtanono@sares-
<br />reais.com
<br />2. Dan Wozniak, Construction Director, Oltmans, M (310) 489-5553/0 (562) 948-4242 danw@o)tmans.com
<br />3. Darin Lee, Project Manager, Oltmans Construction, (562) 94&4242/ darinl@cltmans.com (Reference
<br />Beckman Project)
<br />4. Devin Alexander, Millie &Severson, now with Monarch Construction M (949) 400-9035
<br />5. John Coronel, Project Executive, Millie & Severson, Inc. (562) 49373611 x 243 / johnc@mandsinc com/ M
<br />(562) 889-1831 (Reference Long Beach project)
<br />6. Mike Thomas, Project Manager, Hillwood Construction Services, M(626) 483-8866 /
<br />mike.thomas@hillwood.co (reference Renaissance Bldg 5)
<br />7. Robert Caveche, Vice President, Millie & Severson, (562) 493-361 1 / rcavecche@mandsinc.com
<br />8. Steve Hollis, IDI Logistics, VP Construction, M (949) 351-7243 / Steve.Hollis@idilcoistics.com
<br />PUBLIC WORKS REFERENCES -
<br />I . City of Anaheim, David Kim, Principal Engineer, Water Planning Resources, (714) 765-4206 /
<br />dkim@anaheim net/ Bill Moorhead, Principal Civil City Engineer (714) 765- 4165/ bf-noorliead@analieim.net
<br />ref PRS I & 2 Rehab
<br />2. City of Lake Forest, Doug Erdman, Asst., City Engineering (949) 282-5233 / O (949) 461-3400 /
<br />derdman@lakeforestca.aov, Reference Teed Street Storm Drain.
<br />3. City of Newport Beach, Michael J. Sinacori, P.E. , Acting City Engineer, (949) 644-3342.
<br />4. City of Westminster, Jake Ngo P.E., Deputy City Engineer, (714) 548-3459 / inoo@westminster-ca oov 8200
<br />Westminster Blvd., Westminster, CA 92683. -
<br />5. Eastern Municipal Water District (EMWD), Karl Roland, Construction Inspection/Field Engineering Dept., (951)
<br />928-3777 x 4442 / rolandk@emwd.ora , Reference Morton Road Lift Station Pump Replacement
<br />9let 011111y Pipeline holessianols • 2871 E. COlanada St., Moheun, CA 92806 • wvnr.paulusen&aatilg.com
<br />Paulus Engmeeting, Inc. • General Engineering Connactot lic 724114
<br />251-114
<br />
|