Laserfiche WebLink
E. <br />ON CALL PROJECTS <br />City of Ontario, 1425 S. Bon View Avenue, Ontario, CA 91761 <br />City of Newport Beach, 100 Civic Center Dr., Newport Beach, CA 92660 <br />Don Meyer, 909 395-2677 <br />Mike Sinacori, 949 644-3342 <br />On Call Services since 2011, $1,200,000.00 per year <br />On Call Services since 2015 <br />1. Replacing old brick Manholes throughout the city, ongoing as needed <br />1. Vault Lid Repair, PCH and Dahlia, $7,910.00, 2-28.18 <br />2. Water Meter Replacements throughout city, ongoing, average of 300 <br />2. Meter Vault, Cliff Drive, $11,598.00, 9-15-17 <br />per month <br />3. Repaired 30" Line In Oil Fields, $60,928.00, 3-11-16 <br />3. Long Side Services, 6th Street, $62,442.00, 10.27-17 <br />4. Davit Sleeve Pad, City Yard, $6,972.00, 31-21-15 <br />4. Flood Repairs, 6th Street, $6,478.00, 11-30-16 <br />S. V Ditch Repair, $16,512.00, 9.15-15 <br />S. Sewer Repair, Milliken, $17,183.00, 8-12-16 <br />Bayside Village, 300 E. Pacific Coast Highway, Newport Beach, CA 92660 <br />Moulton Niguel Water District, 26161 Gordon Rd, Laguna Niguel, CA <br />Brian Stith, 949673-1331 <br />92677 <br />1. Repaired 6" water main at PCH and Bayside. Received call at 6 pm, leak <br />Matt Crowl, 949 831-2500 <br />repaired and water flowing back by 11 pm, $4,117.00, 3-3-18 <br />1. Repaired leaking water main, El Toro Rd, $65,973.00, 2-28-18 <br />2. Removed V Ditch, Installed flush outs, restored landscaping and <br />street, Hlllhurst, $43,025.00, 9.30.17 <br />3. Diemer Pipeline Emergency Repair In SCRRA right of way, <br />$142,000.00, 7.7-16 <br />RECENTLY COMPLETED <br />PROJECTS <br />City of Newport Beach, 100 Civic Center Drive, Newport Beach, CA <br />City of Anaheim, 200 South Anaheim Blvd., Anaheim, CA 92805 <br />92660 <br />Luis Tapia, 714 863-8020 <br />Alfred Castanon 949 644-3314 <br />Alderdale Avenue and Maychelle Drive Transmission Main Replacement <br />Balboa Island Water Main Replacement Phase 1 <br />Project <br />4,000' 4-12" PVC pipeline and appurtenances with restoration <br />1,570' 8" PVC pipeline and appurtenances with restoration <br />$1,563,400.00 Project Awarded 12-1-17 Completed 4-18-18, 89%Own <br />$469,744.00 Project Awarded 1.14-17 Completed 4-5-27 <br />forces <br />South Coast Water District, 31592 West Street., Laguna Beach, CA <br />City of Anaheim, 200 South Anaheim Blvd., Anaheim, CA 92805 <br />92651 <br />Tim Flint, 714 765-4137 <br />Joe Sinacorl, 949 499-4555 ext. 3178 <br />Solomon Drive and Baja Drive Water Main Replacement Project <br />PCH Recycled Water Distribution Bottleneck Upsizing Project <br />9,000' 12" DIP pipeline and appurtenances with restoration <br />Installed 6,350' 16" PVC pipeline and appurtenances with restoration <br />$,917,035.00 Project Awarded 5-9-17 Completed 4-10-18 90% Own <br />$3,201,375.00 Project Awarded 7-26-16, Completed 5-27-17,84%Own <br />forces <br />forces <br />City of Ontario, 1425 S. Bon View Avenue, Ontario, CA 91761 <br />Upper San Gabriel Valley Municipal Water District In conjunction with <br />Katie Gienger 909 395-2694 <br />San Gabriel Valley Water Company, 11142 Garvey Ave., Ef Monte, CA <br />Water Main Improvement, Phase 2 Project <br />91732 <br />7,150' B-12" DIP pipeline and appurtenances with restoration <br />Matt Yucelen 626448-6183 <br />$2,338,077.00 Project Awarded 6-7-16, Completed 3-20-17 83% Own <br />South El Monte Recycled Waterline Project, Phase I Project <br />forces <br />13,000' 8-18" GWBR pipeline and appurtenances with restoration <br />$1,770,047.00 (material provided) Project Awarded 9-15-15, Completed <br />1-20-17. 92% Own forces <br />City of Newport Beach, 200 Civic Center Drive, Newport Beach, CA <br />City of Ontario, 1425 S. Bon View Avenue, Ontario, CA 91761 <br />92660 <br />Omar Dandashl with NMC Builders LLC, 909 268-9918 <br />Patrick Arcinlega 949 644-3347 <br />Francis Domestic Water Loop and Recycled Water Project <br />Corona del Mar Transmission Pipeline Improvement Project <br />Wet utilities for New Model Colony Housing Development, 30,000' 24- <br />5,220' 30" CML/C, 2,600' 24" CML/C, 60' 18" CML/C, 490'16" CML/C <br />30" DIP water distribution system <br />pipeline and appurtenances, bored under PCH, Included restoration <br />$10,702,107.00 Project Awarded 10.13-13, Completed 9-30-14, 85°% <br />$4,402,750 Project Awarded 1-23-13 Com leted 6-13-14, 88% Own forces <br />Own forces <br />251-132 <br />