My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60B - TENT PARCEL MAP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
08/20/2019
>
60B - TENT PARCEL MAP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 5:51:10 PM
Creation date
8/15/2019 5:33:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
60B
Date
8/20/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LS 07.24.19 <br />6. The design or improvements of the proposed project will not conflict with <br />easements necessary for public access through or use of the property within <br />the proposed project. <br />The design or improvements of the proposed project will not conflict <br />with easements necessary for public access through or use of the <br />property within the proposed project. Reciprocal access agreements <br />between the project site and the adjacent midrise office building to <br />the west at 2020 East First Street have been recorded, ensuring that <br />all required life -safety access requirements will be maintained. The <br />Applicant will ensure that any/all additional necessary easements, <br />including but not limited to access, egress and drainage between the <br />two buildings on the project site are provided once construction <br />commences on the sites. <br />Section 2. In accordance with the California Environmental Quality Act (CEQA), <br />the initial project, Site Plan Review No. 2017-09, considered by the Planning Commission <br />on June 4, 2018, was determined to be adequately evaluated in the previously certified <br />EIR No. 2006-01 as per Section '15162 of the CEQA guidelines. All mitigation measures <br />in EIR No. 2006-01 and associated Mitigation Monitoring and Reporting Program (MMRP) <br />have been enforced and continue to apply to the proposed project. <br />Pursuant to Section 15162 of the CEQA guidelines, when an EIR has been <br />certified or a negative declaration adopted for a project, no subsequent EIR shall be <br />prepared for that project unless the lead agency determines, on the basis of substantial <br />evidence in the light of the whole record, one or more of the following: <br />(1) Substantial changes are proposed in the project which will require major <br />revisions of the previous EIR or negative declaration due to the involvement of <br />new significant environmental effects or a substantial increase in the severity of <br />previously identified significant effects; <br />(2) Substantial changes occur with respect to the circumstances under which the <br />project is undertaken which will require major revisions of the previous EIR or <br />negative declaration due to the involvement of new significant environmental <br />effects or a substantial increase in the severity of previously identified significant <br />effects; or <br />(3) New information of substantial importance, which was not known and could not <br />have been known with the exercise of reasonable diligence at the time the <br />previous EIR was certified as complete or the negative declaration was adopted, <br />shows any of the following: <br />(A) The project will have one or more significant effects not discussed in the <br />previous EIR or negative declaration; <br />Resolution No. 2019-06 <br />Page 3 of 6 <br />60B-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.