My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60B - TENT PARCEL MAP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
08/20/2019
>
60B - TENT PARCEL MAP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 5:51:10 PM
Creation date
8/15/2019 5:33:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
60B
Date
8/20/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TPM No. 2018-02 — Subdivide Parcel at 2110, 2114, & 2020 E. First Street <br />August 20, 2019 <br />Page 3 <br />tentative parcel map for two airspace condominium units in August 2018. Proposals to create <br />subdivisions of less than five parcels, such as the current project, require review and approval by <br />the Zoning Administrator. <br />Subdivision requests are governed by Chapter 34 and Chapter 41 of the SAMC and the State <br />Subdivision Map Act. Pursuant to Section 66473.5 and 66474 of the California Subdivision Map <br />Act, applications for tentative parcel maps are approved when it can be shown that findings can be <br />made in support of the request. Specifically, these findings require that the proposed project be: <br />• Consistent with the General Plan; <br />• In conformance with all applicable City ordinances; <br />• Physically suitable for the type and density of the proposed project; <br />• Designed to not cause substantial environmental damage or substantially and avoidably <br />injure fish and wildlife or their habitat; <br />• Designed to not cause serious public health problems; and <br />• Designed to not conflict with easements necessary for public access through or use of the <br />property must be made. <br />Using this information staff has prepared the following analysis, which, in turn forms the basis for the <br />recommendation contained in this report. In analyzing the applicant's request, staff believes that <br />the following analysis warrants approval of the tentative parcel map. <br />The applicant is seeking approval of a tentative parcel map to subdivide the subject parcels into a <br />single lot with two air -space condominium units, one per entitled building on the site. In conjunction <br />with the parcel map, the applicant intends to start construction on the mixed -use development <br />entitled by the Planning Commission on June 4, 2018 (Site Plan Review No. 2017-9). Since this <br />application is to create two air -space condominium units, no major issues were identified with the <br />proposal. <br />In reviewing the project, staff determined that the proposal as conditioned is consistent with the <br />various provisions of the City's Zoning Code, the C-2 zoning district and MEMU Overlay Zone <br />standards, with the exceptions of setbacks, parking, open space, and driveway widths, which <br />require approval of concessions and waivers as identified in the proposed density bonus <br />agreement. Conditions of approval are proposed for the map to ensure the development site is <br />maintained and does not become a blight on the area, and that the project's required density <br />bonus agreement be approved prior to approval and recording of the final map. No adverse <br />environmental impacts to fish or wildlife populations were identified as the project site is located in a <br />built -out, urbanized area. Finally, the tentative parcel map was found to be consistent with the <br />California Subdivision Map Act and Chapters 34 and 41 of the Municipal Code. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act (CEQA), the initial project, Site Plan <br />Review No. 2017-09, considered by the Planning Commission on June 4, 2018, was determined to <br />be adequately evaluated in the previously certified EIR No. 2006-01 as per Section 15162 of the <br />CEQA guidelines. All mitigation measures in EIR No. 2006-01 and associated Mitigation <br />
The URL can be used to link to this page
Your browser does not support the video tag.