Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 16-6466 <br />WILLARD NEIGHBORHOOD SEWER MAIN IMPROVEMENTS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: G.J. Gentry General Engineering, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Mobilization/Demobilization (No more <br />1 <br />LS <br />S <br />$ <br />than 5% total bid) <br />38,667.86 <br />38,667.86 <br />2 <br />Remove Existing and Construct 8" PVC <br />2600 <br />LF <br />S <br />$ <br />SDR-26 Sewer Main <br />124.89 <br />324,714.00 <br />3 <br />Construct New P.C.C. Sewer Manhole <br />1 I <br />EA <br />$ <br />S <br />4,509.87 <br />49,608.57 <br />4 <br />Remove Existing Sewer Manhole <br />11 <br />EA <br />S <br />$ <br />1,316.96 <br />14,486.56 <br />5 <br />Construct 4" or 6" PVC Sewer Lateral and <br />69 <br />EA <br />$ <br />S <br />Cleanout form Sewer Main to Property <br />2,631.82 <br />181,595.58 <br />Line ver C.S.A. Std. 1204 (Open Trench <br />6 <br />Construct Driveway Approach <br />2,000 <br />SF <br />S <br />S <br />13.80 <br />27,600.00 <br />7 <br />Sewer Flow Level Monitoring and <br />2 <br />EA <br />S <br />S <br />Alarming Device <br />6,141.00 <br />12,282.00 <br />8 <br />CCTV Inspection of Newly Constructed <br />I <br />LS <br />S <br />$ <br />PVC Sewer Main and Newly Constructed <br />8,809.46 <br />8,809.46 <br />PVC Sewer Laterals (Open trench/Pipe <br />Burst <br />9 <br />Traffic Control <br />I <br />LS <br />S <br />S <br />29,081.88 <br />29,081.88 <br />10 <br />Imported Backfill for Sewer Main <br />1,000 <br />CY <br />S <br />S <br />Construction (Trench zone backfill only)* <br />76.18 <br />76,180.00 <br />11 <br />Signing and Striping <br />I <br />LS <br />S <br />S <br />3.428.15 <br />3,428.15 <br />12 <br />Project Advertising Sign <br />1 <br />EA <br />S <br />S <br />4,374.97 <br />4,374.97 <br />13 <br />As -Built <br />I <br />I LS <br />I 525,000 <br />525,000 <br />P-1 ofP-I6 <br />23B-9 <br />