My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23C - CHANNEL IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
08/20/2019
>
23C - CHANNEL IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 5:39:18 PM
Creation date
8/15/2019 5:33:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23C
Date
8/20/2019
Destruction Year
2024
Document Relationships
R.J. NOBLE COMPANY (2)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 19-6941: ALTON REHABILITATION FROM RAITT TO BRISTOL <br />PROJECT NO.: 19-6617: ALTON DRAINAGE REPAIR AT D-03 CHANNEL <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: R.J. NOBLE COMPANY <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation* <br />900 <br />CY <br />S <br />S <br />2 <br />ACPavemenf" <br />1,300 <br />TN <br />$ <br />S <br />3 <br />Asphalt Rubber Hot Mix* <br />1,920 <br />TN <br />S <br />S <br />4 <br />ARAM* <br />16,800 <br />SY <br />S <br />S <br />5 <br />Crack Seal* <br />350 <br />GAL <br />$ <br />S <br />6 <br />Cold Milling (3"-4")' <br />136,000 <br />SF <br />S <br />S <br />7 <br />PCC Sidewalk (4") <br />3,100 <br />SF <br />S <br />S <br />8 <br />PCC Driveway Approach (Commercial = 8") <br />400 <br />SF <br />$ <br />$ <br />9 <br />PCC Curb Ramp <br />1,500 <br />SF <br />S <br />S <br />10 <br />PCC Curb and Gutter (Type A-2-8) <br />560 <br />LF <br />S <br />S <br />I <br />Root Shave <br />4 <br />EA <br />S <br />S <br />12 <br />Adjust Water Valve Frame and Cover to <br />Finished Grade <br />11 <br />EA <br />S <br />s <br />13 <br />Adjust Sewer and Drainage Manhole to <br />Finished Grade <br />3 <br />EA <br />S <br />S <br />14 <br />Furnish and Install New N6 Pullbox <br />14 <br />EA <br />S <br />S <br />P-1 ofP-17 <br />23C-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.