My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23C - CHANNEL IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
08/20/2019
>
23C - CHANNEL IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 5:39:18 PM
Creation date
8/15/2019 5:33:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23C
Date
8/20/2019
Destruction Year
2024
Document Relationships
R.J. NOBLE COMPANY (2)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 2 <br />ALTON REHABILITATION FROM RAITT TO B RISTOL & ALTON DRAINAGE <br />REPAIR AT D-03 CHANNEL (19-6941 & Printed 0V2=19 <br />Bid Resufts <br />Typo <br />Item Code <br />UoM <br />oty <br />Unit Prim <br />Line Total Comment <br />3 <br />Asphalt Rubber Hot Mix" <br />TN <br />1920 <br />. ... <br />$86.00 <br />$163.200.00 <br />4 <br />ARAM. <br />.. .... <br />...... .... <br />SY <br />... ... <br />10800 <br />$7.00 <br />$117.000.00 <br />5 <br />Crack Seal* <br />........... . <br />GAL <br />3W <br />$48.00 <br />$16,800.00 <br />6 <br />Cold Milling (3"-4")* <br />SF <br />136000 <br />............. <br />$0.28 <br />$38.080.00 <br />... .. .. <br />7 <br />PCC Sidewalk (41 <br />. <br />SF <br />3100 <br />$5.25 <br />$16,275.00 <br />a <br />PCC Driveway Approach (Commercial = 8') <br />SF <br />400 <br />$9.00 <br />$3.600.00 <br />9 <br />PCC Curb Ramp <br />....... .. <br />. <br />SF <br />1500 <br />$12.00 <br />$18,000.00 <br />10 <br />PCC Curb and Gutter (Type A-2-8) <br />.. . ... ........ .... ... . <br />LF <br />580 <br />$30.00 <br />$16,800.00 <br />11 <br />Root Shave <br />EA <br />4 <br />$300.00 <br />$1,200.00 <br />12 <br />Adjust Water Valve Frame and Cover to Finished <br />Grade <br />EA <br />11 <br />$1,300.00 <br />$14,300.00 <br />13 <br />Adjust Sawerand Drainage Manhole to Finished Grade <br />EA <br />a <br />$1.300.00 <br />$3,900.00 <br />14 <br />Fumish and Install Now 46 Pullbox <br />........ ... <br />EA <br />14 <br />$900.00 <br />$12,600.00 <br />15 <br />Furnish and Install New 46 Pullbox Tragic Rated <br />EA <br />2 <br />$1.000.00 <br />$2,000.00 <br />16 <br />Furnish and Install Traffic Loops Type E <br />EA <br />30 <br />$225.011 <br />$6,750.00 <br />17 <br />Temporary Construction Sign <br />.. ... ... <br />.. .. <br />EA <br />2 <br />$525.00 <br />$1.050.00 <br />18 <br />Project Advertisement Sign <br />EA <br />2 <br />$800.00 <br />$1,600.00 <br />PlanotBids Inc <br />23C-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.