My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3- MND 2016-156; GPA 2018-05; AA 2018-08_301 N TUSTIN
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
10-08-2018
>
3- MND 2016-156; GPA 2018-05; AA 2018-08_301 N TUSTIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 1:00:09 PM
Creation date
8/16/2019 12:59:14 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOS āDā Requirements <br />2. Tustin Avenue at First Street <br />4. SR-55 NB Ramps at Fourth Street/Irvine Boulevard <br />7.2 Traffic Impact Analysis Scenarios <br />The following scenarios are those for which volume/capacity calculations have been performed at <br />the four (4) key intersections for existing plus project, near-term (Year 2019) traffic conditions: <br />A. Existing Traffic Conditions; <br />B. Existing Plus Project Traffic Conditions; <br />C. Scenario (B) with Improvements, if necessary; <br />D. Near-Term (Year 2019) Cumulative Traffic Conditions, <br />E. Near-Term (Year 2019) Cumulative plus Project Traffic Conditions; <br />F. Scenario (E) with Improvements, if necessary; and <br />G. Scenario (H) with Improvements, if necessary. <br />3-100
The URL can be used to link to this page
Your browser does not support the video tag.