My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3- MND 2016-156; GPA 2018-05; AA 2018-08_301 N TUSTIN
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
10-08-2018
>
3- MND 2016-156; GPA 2018-05; AA 2018-08_301 N TUSTIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 1:00:09 PM
Creation date
8/16/2019 12:59:14 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 9-1 <br />PROJECT DRIVEWAY PEAK HOUR INTERSECTION CAPACITY ANALYSIS SUMMARY <br />Key Intersection <br />Intersection <br />Control <br />Time <br />Period <br />(1) <br />Year 2019 <br />Plus Project <br />Traffic Conditions <br />Delay LOS <br />A. Project Driveway 1 at <br />Fourth Street <br />One-Way <br />Stop <br />AM 21.0 s/v C <br />PM 18.9 s/v C <br />B. Tustin Avenue at <br />Project Driveway 2 <br />One-Way <br />Stop <br />AM 12.2 s/v B <br />PM 15.4 s/v C <br />C. Tustin Avenue at <br />Project Driveway 3 <br />One-Way <br />Stop <br />AM 15.2 s/v C <br />PM 19.8 s/v C <br />Notes: <br /> Bold Delay/LOS values indicate adverse service levels based on the Cities LOS standards <br /> s/v = seconds per vehicle <br />3-106
The URL can be used to link to this page
Your browser does not support the video tag.