My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3- MND 2016-156; GPA 2018-05; AA 2018-08_301 N TUSTIN
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
10-08-2018
>
3- MND 2016-156; GPA 2018-05; AA 2018-08_301 N TUSTIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 1:00:09 PM
Creation date
8/16/2019 12:59:14 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program <br />Authority and Purpose <br />Pursuant to, and in accordance with California Public Resources Code, Section 21081.6 (AB 3180), a <br />mitigation monitoring and reporting program for the City of Santa Ana’s Tustin Avenue Retail Project <br />Mitigated Negative Declaration (MND) SCH# 2018081033 has been prepared. The purpose of this <br />Mitigation Monitoring and Reporting Program (MMRP) is to ensure compliance with and effectiveness of <br />the mitigation measures set forth in the Tustin Avenue Retail Project MND. Section 15074(d) of the <br />CEQA Guidelines states that, when adopting a mitigated negative declaration, the lead agency shall adopt <br />a program for reporting on or monitoring the changes that it has either required in the project or made a <br />condition of approval to reduce or avoid significant environmental effects. Section 21081.6 of the Public <br />Resources Code and Section 15097 of the CEQA Guidelines require a public agency to adopt a mitigation <br />monitoring and reporting program for assessing and ensuring the implementation of required mitigation <br />measures applied to proposed projects. <br />Monitoring Program List of Mitigations <br />The City of Santa Ana’s Mitigation Monitoring and Reporting Program for the Tustin Avenue Retail <br />Project consists of a list of mitigation conditions and/or verifications required for incremental <br />implementation of the project. The following provides information regarding the purpose and procedures <br />for each individual significant impact and related mitigation measures. For each significant impact and <br />corresponding set of mitigation measures, the party responsible for mitigation implementation and <br />monitoring is identified. The required timing for implementation of each measure is also specified. <br />3-17
The URL can be used to link to this page
Your browser does not support the video tag.