My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3- MND 2016-156; GPA 2018-05; AA 2018-08_301 N TUSTIN
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
10-08-2018
>
3- MND 2016-156; GPA 2018-05; AA 2018-08_301 N TUSTIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 1:00:09 PM
Creation date
8/16/2019 12:59:14 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 PROJECT DESCRIPTION <br />The Project site is comprised of two parcels and is currently occupied by an existing gas station <br />building and car wash at 325 N. Tustin Avenue and a sit-down restaurant at 301 N. Tustin Avenue. <br />The site is generally located south of Fourth Street and east of Tustin Avenue. Both properties are <br />located in the Professional (P) zoning district. 301 N. Tustin Avenue has a General Plan land use <br />designation of Professional & Administrative Office (PAO) and 325 N. Tustin has the General Plan <br />land use designation of General Commercial (GC). As proposed, the Project requires approval of a <br />general plan amendment to change the land use designation from PAO to GC, zone change from P to <br />Commercial General (C2) and a conditional use permit for the proposed drive-through services. <br />Figure 2-1 is an existing aerial photograph of the Project site. <br />The Project will include the development of a commercial building with a drive-through and a gas <br />station convenience store at 301 and 325 N. Tustin Avenue, respectively. The Project would include <br />construction of a 7,417 square-feet (SF) commercial building with drive-through to replace a 4,200 <br />sit-down restaurant and a 2,778 SF gas service station convenience store to replace the existing gas <br />station building and car wash. Please note that the proposed Project will provide internal access <br />between the two parcels. <br />Table 2-1 provides a summary of the proposed Project components. <br />The Project is expected to be constructed and completed by Year 2019, which has been utilized to <br />assess the Project’s potential traffic impacts at full occupancy of the site within an opening year <br />traffic setting. Figure 2-2 presents the site plan for the proposed Project prepared by Bundy Finkel <br />Architects. <br />2.1 Site Access <br />Vehicular access to the existing gas station at 325 N. Tustin Avenue is currently provided by one (1) <br />right in-right out driveway on Tustin Avenue and two (2) right in-right out driveways on Fourth <br />Street. Access to the existing restaurant at 301 N. Tustin Avenue is currently provided by one (1) full <br />access driveway and one (1) right in-right out driveway on Tustin Avenue. <br />Vehicular access will remain generally similar to the current driveways with the exception of the <br />removal of the one (1) right in-right out driveway at the existing restaurant along Tustin Avenue and <br />the western right in-right out driveway along Fourth Street. A total of three (3) driveways will <br />provide access to the proposed Project site. <br />3-63
The URL can be used to link to this page
Your browser does not support the video tag.