My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - CUP8-19; CUP 18-20; VAR 18-11_2301 N TUSTIN AVE
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
10-22-2018
>
3 - CUP8-19; CUP 18-20; VAR 18-11_2301 N TUSTIN AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 1:08:05 PM
Creation date
8/16/2019 1:07:51 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2018-xx <br />Page 8 of 8 <br />(h) The execution and recordation of the Maintenance Agreement shall be a <br />condition precedent to the issuance of final approval for any construction permit <br />related to this entitlement. <br /> <br />II. The following are requirements that will need to be addressed and/or approved <br />by the Police Department prior to issuance of a building permit: <br /> <br />1. Submitted plans must indicate that all structures and parking lots comply with the <br />provisions of Chapter 8, Article II, Division 3 of the Santa Ana Municipal Code <br />(Building Security Ordinance). All applicable sections must be printed verbatim on <br />the submitted set of plans. <br /> <br />III. The following are requirements that will need to be addressed and/or approved <br />by the Orange County Fire Authority prior to issuance of a building permit: <br /> <br />1. Prior to the issuance of a building permit, the Applicant shall submit the <br />Architectural Plans (PR208) for Starbucks to the Orange County Fire Authority <br />for review and approval. <br /> <br />IV. The following are requirements that will need to be addressed and/or approved <br />by the Public Works Agency prior to issuance of a building permit: <br /> <br />1. The Applicant shall submit plans to install a “pork chop” right-turn only directional <br />curb on-site within the driveway on Tustin Avenue. The driveway and “pork chop” <br />shall be designed to City Standards and approved by the Public Works Agency. <br />The improvements shall be installed prior to issuance of a Certificate of <br />Occupancy. <br /> <br />2. The Applicant shall submit plans showing the installation of a right-turn only sign <br />at the Santa Clara Avenue driveway. The improvements shall be installed prior to <br />issuance of a Certificate of Occupancy. <br /> <br />3. The Applicant shall submit payment of the fair-share contribution in the amount of <br />$30,898.00 for the Santa Clara Avenue and Tustin Avenue traffic signal <br />modification. <br /> <br />3-17
The URL can be used to link to this page
Your browser does not support the video tag.